Analysis And Application Study To Construction Claim

Posted on:2010-11-26Degree:MasterType:Thesis
Country:ChinaCandidate:J TengFull Text:PDF
GTID:2189360272484614Subject:Project management
Abstract/Summary:PDF Full Text Request
In recently years, along with the architecture industry vigorous development, and the market competition day by day intensely in international and internal project, the low price was selected oneself to become the ordinary phenomenon, which caused the construction enterprise faced with it in the management, financial and the management risk, but our internal construction enterprise universal existence government level low, the critical talented person deficient, the fund operation and financing ability urgently awaited to strengthen, the risk control relatively weak, the resources conformity ability pending enhancement and so on all sorts of questions, therefore the claim management took the construction enterprise management and operation the important constituent, its management level height direct demonstration construction enterprise's management and operation level height, also was deciding whether the enterprise did base complex on the market that was changeable and struggled unexpectedly.The construction enterprise have the very high value to completes the claim work, but often is at the passive condition in the claim work, the reasons of restricting its passive primary mainly was: one is that cannot guarantee the claim evidence the validity and the effectiveness, the other is that cannot accurate, calculate the claim expense and the prompt establishment claim report reasonably.Through to the analysis to the reasons that caused the claim, this article elaborated the claim evidence type as well as the construction claim content, and has analyzed the characteristic of present turn-key contract and the influence to sues for damages the management, has analysis that carried on the problem to the construction these two main questions which exists in the claim management, and propose the concrete solution which aims at the question. The solution is to enhance claim evidence effective collection and the use reasonably, we must have the unification coordinated project management organization team, has the consummation data compilation system, and forms the effective control point in the different construction stage, and accurate reasonable computation claim expense, be clear about the claim expense and the time limit for a project correct computational method, grasps the correct claim procedure to propose the claim promptly, and explained through the case analysis.The contract management also is sues for claim management the key content, the construction enterprises enhance claim management ability, and it can sharpen its profit ability, thus enhancement enterprise's market competitive power, in competition intense construction market vigorous development.
Keywords/Search Tags:claim, the evidence, claim expense, claim management
PDF Full Text Request
Related items