The Agency-Serving Management Mode Of Express Track Train From Tianjin Downtown To Binhai

Posted on:2008-02-10Degree:MasterType:Thesis
Country:ChinaCandidate:H J LiFull Text:PDF
GTID:2189360245492233Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
The project of express track train from Tianjin downtown to Binhai new developed area is the key project in Tianjin(abbreviated as Jin-Bin project in the context).The whole investment of first stage has been estimated as 6,372.09 millions Yuan and the highest speed deigned is 100km/h.The project went into operation on May 18, 2001, and was built open to traffic on October 1, 2003.In the project operation, many properties should be removed away and the project needs to be divided into many segments. It is also professional, complicated and urgent and the criterion of this project is strict. It has many parallel projects, in the same time, it is changeful. The owner constructs a set of flexible and feasible management system including many controls ceiling of different levels in order to make the management control easier. This article analyzed the construction theories and operation effects of the system, pointed out the direction to improve and of make the beneficial experience for the next stage of project and other public projects.The agency-serving management mode was the guide and theory base of the system,which need a capable organization system to carry it out. In the process of management,the possibility of creativity is everywhere. It was made up of subdividing patterns of control ceiling, organization structure and function arrangement. All of them support each other to achieve the goal so that the obligation and right are clear and subdivisions of the work are strict.The effective management needs ideas of the integrity, so more attention should be paid to the all-process management. From the point of integrity, new ways should be utilized to the all-process controls. Jin-Bin project use the valuation engineering and limit design ideas in the engineering control. It also chose the suitable materials, equipment and the engineering solutions, and drawn up the work in engineering stage and check process, and other important stages.Jin-Bin project with very long road need great investment and complicated technological processes. Several billions Yuan of investment need to be contracted out in the market. The purchase system of Jin-Bin project build up the perfect system to invite or submit a bid ,so that the cost could be well controlled. Basing on the situation of the project,the whole project had been divided into several subdivisions contracted out as following: management system was divided into 8 subdivisions. The severe qualification approval and process on inviting or submitting a bid had been established. In the process of management, more attention should be paid to the changing surroundings.It is the main function for investment control system to control the project change and claim for the compensation. All kinds of complicated factors would cause the project cost change, so the management control had detailed the change and claim check process for the design and sequential management. Meantime, the project realized all-process control through kinds of segments, such as the consulting system, the investment control system, the security-insurance system, and so on. The result of the agency-serving management mode is legitimate.All-process control is the crucial part of the management system. The owner builds the check and confirmation process for the management system, at the same time the strict approval method for the settlement also formed. It is safe to draw a conclusion that the management of the project based on the agency-serving is satisfactory.
Keywords/Search Tags:agency-serving management mode, all-process control, Management mode, system science
PDF Full Text Request
Related items