Preliminary Feasibity Study On BOT Application On Cangnan Refuse Incinerating Power Generation Project

Posted on:2008-10-28Degree:MasterType:Thesis
Country:ChinaCandidate:S P ZhengFull Text:PDF
GTID:2189360245452668Subject:Public Management
Abstract/Summary:PDF Full Text Request
The disposal of city domestic refuse is a problem the whole world must face, especially in China with large population. The total amount of city domestic refuse has increased rapidly with the further development of national economy and society, and a long with the acceleration of civilization and the increase of city population. However, the formerly adopted rough manner of refuse disposal has not kept pace with the requirement of today's city construction of environment modernization. Therefore, it is an exigent task for government to find a more effective and sustainable manner of refuse disposal.The refuse incineration power plant is a kind of city infrastructure, the common features of which are large amount of investment, low level of operation and management, and low efficiency in economy. Nowadays, the refuse incineration power generation shows its advance in the manner of refuse disposal. If the former mode of construction, operation and management is still adopted, the successful operation of this project cannot be guaranteed In order to solve the problem completely, the former mode of construction and management must be changed. It has been proved in practice that BOT mode is an effective way to solve this problem.Cangnan refuse incinerating power generation Project is an infrastructure to be constructed by the government in the very near future. Some feasibility studies have been conducted in the earlier stages, and the internationally common mode of BOT is to be adopted. According to the operating features of common BOT projects, this paper first makes a general planning for this project, and contract structure for this project. Finally, the paper puts forward the operating sequence for Cangnan refuse incinerating power generation project, and the possibly-taken measures to prevent the risks.This paper makes a general study on the initial feasibility for Cangnan refuse incinerating power generation project, and puts forward the idea that domestic and state owned corporate fund participate into this project. Meanwhile, this paper also proposes an approach of manufacturing the key equipment based on the imported technology. It is expected that this article could be a reference to the construction of Cangnan refuse incinerating power generation project to be implemented soon.
Keywords/Search Tags:Refuse Power Generation, BOT Projects, Feasibility Study
PDF Full Text Request
Related items