Font Size: a A A

XX Company Waste Incineration Power Generation PPP Project Management Studies

Posted on:2019-12-23Degree:MasterType:Thesis
Country:ChinaCandidate:L ZhaoFull Text:PDF
GTID:2429330572457303Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In recent years,China's economy has made rapid development,the transformation of urbanization is changing with each passing day,a large number of rural people flock to cities and towns,and the existing infrastructure and public service facilities are overloaded in front of the increasing urban population.Because of the financial pressure of local governments,the traditional government-led model will be difficult to maintain the normal operation of infrastructure and public services.The PPP model,public-private partnerships,emerges as the times require.It not only alleviates the huge financial pressure of the government,but also solves the shortage of funds in infrastructure and public services.It also gives full play to the advantages of social capital in technology,research and development,and management.With the rapid development of PPP mode in China,PPP mode has been widely applied in the field of waste incineration power generation.The PPP mode is currently an effective means to solve the problem of urban domestic refuse disposal in China.With the continuous application and promotion of PPP project for waste incineration power generation,the construction and operation of waste incineration power generation projects in various parts of China have gradually exposed some management problems of such projects.XX company refuse incineration power generation project management problems mainly include the project risk prevention and control is not strict,the identification of some risk issues is not strict,the lack of consideration of unknown risk redistribution;project contract management is difficult to effectively implement,especially in the contract revenue and refuse supply issues;project financial management before.The period is unqualified,and the evaluation of project value for money and financial capacity are not rigorous.The root causes of these problems are the large number of project participants,the long project cycle,the complex process and other risk factors,as well as the inadequate measures to deal with the project in the face of many risks;the inadequate contract supervision of the project,the lack of regulatory mechanism,the supervision of the government on itself,XX company and other project participants.Insufficient management;incompletecollection mechanism of garbage disposal service charges;unreasonable formulation and management of garbage disposal price and electricity sale price of XX company;weak awareness of residential garbage classification collection caused by inadequate government propaganda;the current urban domestic garbage is still discarded and accumulated in disorder,not classified collection;project company The pre-demonstration of financial management has not been paid enough attention;there is a shortage of project professionals and compound talents,and the training management mechanism is not perfect.In order to better develop the waste incineration PPP project,let the waste incineration power generation PPP project give full play to its own advantages,solve the problems of high growth rate of domestic waste in cities and towns,backward waste treatment methods and shortage of funds.Combining with the basic situation of our country,PPP mode's own characteristics and waste incineration According to the specific situation of power generation,several opinions and suggestions are put forward: firstly,to strengthen the overall risk expectation and formulate perfect countermeasures;secondly,to strengthen the project contract management;thirdly,to refine the specific ways and methods of garbage collection management;fourthly,to promote garbage classification collection by the whole people,and to strengthen propaganda and education by government departments;Fifth,strict project financial management early demonstration;sixth,optimize talent structure,strengthen cooperation and exchanges.It can accumulate experience and provide reference for PPP project of garbage incineration in the future.
Keywords/Search Tags:PPP mode, Refuse incineration power generation, Project management
PDF Full Text Request
Related items