With Guangdong LNG projects, Guangxi and Hainan gas projects are putting into effect, the gas electric power generation projects have been already established step by step to generate electricity. At the same time, the Electric Power Market of the South Region construction successive steps quickens self's steps, which of market rules is further perfect. So the gas power generation biding is necessity and other strong the type generation in the power market. At present in the power market condition of the south region, if gas power generations bid that there would be no advantage .The thesis studies from five aspects, such as environment of the power market,construction biding,generation economy and Environment value, which giving a gas power generation biding policies play by stages, supporting the policy of sources of energy country and gas industry development policies is put into effect. |