Research On Construction Management Due To Olympics Sailing Base Project In Qingdao

Posted on:2009-03-19Degree:MasterType:Thesis
Country:ChinaCandidate:H Q HaoFull Text:PDF
GTID:2189360242986606Subject:Project management
Abstract/Summary:PDF Full Text Request
In this article, author reviews the impact of contracting method to owner, explains the Characteristics of s construction management mode and organize structure. After analyze of the situation of 2008 QINGDAO Olympics sailing base project management, the selection of the contracting method and the current organization structure, the author consider that the construction management mode can meet the requirement of project management, and in effective promote the prosecution of the project .But as the increasing of the number of enterprises, the functional organization structure of the project can not meet the requirement of the project management. Based on the above conclusions, the author put forward the optimize opinion of organization structure of Olympics sailing base project, which can be a valuable reference of the management of the similar huge group engineering project. Hao Haiqing (Project Management)...
Keywords/Search Tags:Olympics sailing base, construction management mode, organization structure
PDF Full Text Request
Related items