Font Size: a A A

Based On Synchronous Manufacturing Operations Planned Of The Bottleneck To Investigate

Posted on:2008-02-27Degree:MasterType:Thesis
Country:ChinaCandidate:J Z FengFull Text:PDF
GTID:2189360242465916Subject:Business management
Abstract/Summary:PDF Full Text Request
Along with the economical developing and the environment changing, enterprise's competition is more and more intense. Enterprise's competition around whether the products to serve the customers better this center to start. This need effective production system: It is not only can satisfy the user's request of the product,but also fast reflect and satisfy the market' s demand and realize enterprise's management strategic target, causing the enterprise to achieve competitive advantage in the market, creating more benefits. This article introduced one kind of effective productive plan and control system - Synchronous Manufacturing (SM) system, by the synchronized manufacture's thought, the goal and the appraisal system, the basic principle, used the mathematical model quantitative to analysis bottleneck link of the synchronized manufacture process batch and transmission batch, proposed the MPS of synchronized manufacture to dive dug to the bottleneck.The first chapter is introduction. First elaborated this article study of the background and the significance, then further analysis and induces the domestic and foreign correlations research results, lastly elaborated this article main research content. .The second chapter introduce the modern enterprise's the question of productive plan and control which faces, through analysis the MRPII system and the JIT system application and the limitation, compared with advantages and disadvantage around the method TOC of the synchronized manufacture' system and the MRP II system and the JIT system, proposed the synchronized manufacture' management philosophy.Third chapter emphatically elaborated based on the synchronized manufacture to optimize bottleneck link, from the synchronized manufacture basic thought and the philosophy of TOC manpower, introduced the synchronized manufacture goal and the appraisal system, the basic principle, the basic step and dig to the bottleneck link, finally introduced the synchronized manufacture to optimize bottleneck link tool's DBR system and the productive plan diagram.Fourth chapter emphatically discussed and has studied synchronized manufacture productive plan to optimize bottleneck link. First it utilized the synchronized manufacture's basic principle to confirm singularity bottleneck link's process batch and transmission batch as well as the multi-bottlenecks link's process batch and transmission batch, then revolved the synchronized manufacture thought which dug the bottleneck link and established several kinds of synchronized manufacture's taxis algorithm, then produced MPS of synchronization manufacture.Fifth chapter summarized to this article main work spear and had pointed out this article insufficiency, and will study the expectation of the future.
Keywords/Search Tags:Produce plan and control, Synchronous Manufacturing, Process batch quantity, Transmission batch quantity, Produce taxis algorithm, Bottleneck
PDF Full Text Request
Related items