Font Size: a A A

Economics Analysis Of Building The AS/RS

Posted on:2008-07-17Degree:MasterType:Thesis
Country:ChinaCandidate:X ZhouFull Text:PDF
GTID:2189360212992222Subject:Logistics Management and Engineering
Abstract/Summary:PDF Full Text Request
AS/RS (Automated Storage and Retrieval System)is an important part of modern logistics systems and is widely applied to every walk of life.Presently it has become one of the signs in enterprise production automation and management information.As AS/RS with large investment and a long payback period, etc. Therefore, it is investing in its construction, the need for AS/RS construction projects for a full evaluation and design, including the need for assessment, technology assessment, systems development, the sensitivity analysis, and so on. This requires the past and the future three to five years of storage capacity, storage capacity, orders for goods such factors as the type of analysis. These require a very long period of time and a great human, material and time invested.Traditionally, at home and abroad on a AS/RS presentation and application although many, But more than a pure technical perspective AS/RS operation, and rarely from the perspective of economic its analysis, This paper is seizing the AS/RS operation mode of economic analysis that perspective, right AS/RS for research. Through two specific quantitative targets, the first is cost-effective First Combined with the principles of economics, attempt from the economic point the AS/RS in practical applications and the advantages of limitations.In theory, the main use of capital investment budget decision-making, multi-objective decision-making, enterprise image economics theory, Empirical Analysis of the selected higher education press AS/RS design as a case, Through theoretical methods to guide practice. In theory, under the guidance of research automated warehouse development process and the root of existing problems and propose solutions, avoid from practice to the practice.There are six figures, seventeen tables, twenty five references in this paper.
Keywords/Search Tags:AS/RS, decision-making of investment, cost, benefit
PDF Full Text Request
Related items