Font Size: a A A

Study About The Methods Of Production Logistics Management And Control In Underground Coal Mine

Posted on:2007-03-15Degree:MasterType:Thesis
Country:ChinaCandidate:W LiFull Text:PDF
GTID:2189360185492448Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Production logistics management in underground mine particularly stuff management ,transportation and the use of tub ,attemper work, is the significant restriction element of coal mine safe production .Based on the practical need of safe production work , this article studies the methods of production logistics management and control in underground mine deeply. According to modern logistics theory, system science rule and computer network technique, it puts forward complete set of means on production logistics management and control in underground mine and such software kit system- production logistics dynamic management system in underground mine.The methods of production logistics management and control in underground mine which are consist of the stuff and the tub administration and control in underground mine, are fit for mine corporation. Production logistics dynamic management system in underground mine are composed of two subsystems which are stuff dynamic management system and tub dynamic management system. It is a application software system running under the C/S pattern of local network. Through using the study results of this article, we can transmit and transact production logistics information in computer local network, analyse , manage and control the condition of production logistics of each district group, then put out manufacture matter , administer and use tubs in order to validly supply manufacture stuff and effectively cut down stuff consumption and the tub use fee; At the same time, it supplies convenient and prompt bidirectional exchange measure on the network for mine and every section office, mine and work area, every section office and work area which make production logistics information and instruction spread more accurately and promptly, then administer and control it .
Keywords/Search Tags:production in underground mine, logistics management and control, the dynamic management of stuff, the dynamic management of tub, safe production
PDF Full Text Request
Related items