| The electricity law established the main legal system of electric power construction, including the electric power development planning system, city network construction and retrofit planning system, protect the power the legitimate rights and interests of investors system, use the content such as land system according to law. Place the region with the actual situation of electric power construction, through the form of legislation, enrich and perfect the system of electric power construction of content. This article from the electric power development planning system, the use of the land system according to law, the electric power investment protection system three aspects, summary and analysis of local electric power legislation on the electric power construction system of the new development of the our country law, hoped to modify and power system reform working to provide some beneficial reference.The electric power development planning, it is to point to electric power planning department in electric power construction development present situation, based on promoting economic development as the center, through comprehensive economic and technology, resource is put forward in the fixed number of year, in economy, technology, and structure of the electric power development scheme. Best Local legislation further strengthening the role of the electric power development planning, and introduces the power development right management system. Power rights management system is to point to to get the power market access conditions as electric power development power optimization allocation of resources system.Electric power construction use land including electric power construction projects land and power grid construction land. Local electric power of the legislation in electric power construction projects, land compensation standard time limit for examination and approval, the relevant measures for solving disputes has made the new regulations, the electric power construction project examination and approval the efficiency is low, the several problems of land expropriation proposed the feasible solution to a problem. Through to the power grid construction land acquisition modes of discussion, this paper introduced the concept of power grid construction land easement. Power grid construction land easement, it is to point to the electric power enterprise to realize the convenience of power transmission and use land ownership or use right of land people who, making the original land rights holders must burden right. The paper introduced the power grid construction land easement of subject, object, content, establishment and registration, the easement was put forward based on the power grid construction land compensation mode.Protect the power the legitimate rights and interests of investors to our country the development of the electric power industry and the formation of the power market has an important meaning, mainly from electric power construction planning and adjust electric power construction projects that use the land and electric power construction planning and other programming interfere with each other two circumstances of how power investor protection in this paper.Electric power construction legislation should deal with the relationship between the legislation higher norm and policy, rational distribution rights and obligations, the establishment of scientific legal liability clauses. |