Study On The Model Of Agile Shipbuilding Resource Allocation And Buffer Based On Critical Chain

Posted on:2012-12-07Degree:MasterType:Thesis
Country:ChinaCandidate:C PeiFull Text:PDF
GTID:2189330338994880Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Agile manufacturing has become the main mode of the 21st century, shipbuilding, it synergistic manner Alliance made on the shipping market and flexible rapid response. Modern shipbuilding mode of application and promotion, to accelerate the ship structural design the formation of modular and standardized technology. With the introduction of advanced manufacturing theory, making the modern shipbuilding mode direction quickly to agile manufacturing. This ship manufacturing, ship building project is a ship design, production planning, ship assembly and other management functions as an independent body or chief, to the various production centers within the shipyard and a lot of supporting plants, raw material suppliers and foreigncomposed of multi-project co-plant dynamic alliance.As the ship model to agile manufacturing depth, due to the scarcity of resources and sharing among the various projects, resources, more serious conflict. Composed by a number of ships leaguer agile manufacturing enterprise business in resource allocation and production planning is facing new challenges.Critical Chain Project Management as a new technique, applied to practice effectively shorten the construction period, reduce resource conflicts and reduce the uncertainty of project implementation, therefore, this key chain learn from the ideas and methods will be introduced to the key chain idea all ocation of resources in agile manufacturing, agile manufacturing resources to solve the problem. First, the analysis of the real ship agile manufacturing, agile manufacturing, combined with the ship now made the process of shipbuilding resources. Through theoretical analysis of the key chain, key chain and then puts forward the theory based on the ship thinking and agile manufacturing resource allocation methods. Secondly, through the resource allocation model, buffer management, and optimization of the key issues, the allocation of resources for the ship to provide agile manufacturing methods. Finally, Xiamen Shipbuilding Industry Co. Ltd. ships agile manufacturing are analyzed by collecting data from production systems, system modeling, simulation runs to determine the critical chain agile manufacturing ships, and on this basis, optimal allocation of resources drawn on the program and buffer settings the specific location and size, in order to achieve an agile shipbuilding.
Keywords/Search Tags:ship agile manufacturing, Critical Chain, resources, buffer, ant colony algorithm
PDF Full Text Request
Related items