SBD's Project Schedule Control, Cost Control Technology Optimization

Posted on:2012-12-26Degree:MasterType:Thesis
Country:ChinaCandidate:J LiFull Text:PDF
GTID:2189330332993966Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Today in the rapid development of the project has become a basic human development and progress of activities and means. Project management is increasingly being valued by the people. Project management in developed countries has developed into a new profession and discipline. Project management is a collection of management, operations research, network control, and many other disciplines one for systems engineering, how to ensure the quality, safety, under the premise of cost-saving investment in technology to create a satisfactory economic benefits, and to maximize, and building more and more become the key to every construction project. This paper is how to schedule control and cost control are two main conflicts under certain conditions,Harmonization to consider the schedule control and cost control in construction project management of the enterprise to achieve a coordinated and unified in order to explore a construction enterprise management level to improve a path, the construction progress of enterprise project management and cost to achieve a kind of the best combinations.In this paper, the progress of the construction project control, quality control, cost control management objectives as a starting point for the control of the basis of cost control, schedule control of the network plans to control the method as a tool for construction project cost control and schedule control of these two issues done in-depth study. First, determine the project's cost, target cost of the decomposition and control methods and control process and other aspects were analyzed and discussed. Second, the introduction of dynamic control theory, with progress control as a tool for continuous progress and costs of the coordination point between the best approach. Finally,This method uses sophisticated software that the U.S. International Primavera System Inc. Company developed a sophisticated commercial project management software Primavera Project Planner as a tool to be tested in practice and used to produce some economic benefits.In the study, the article uses the global and dynamic control of viewpoint and theory, between schedule control and cost control for unified consideration. In the process of study, advanced control technology, to take effective control measures which target ahead of schedule period, investment returns ahead of schedule. At this time, time control has been translated into cost control. While the article in Electric Power Construction Company as a research background, building a new business construction schedule and cost control management, but in other construction companies, and even have some project management reference. In the article, the integrated use of various analysis methods,Combines the theory of many disciplines, to provide enterprise management efforts to find a direction.
Keywords/Search Tags:Construction object, Progress Control, Cost Control
PDF Full Text Request
Related items