Font Size: a A A

Timing Management Study Of YK Program In F Company

Posted on:2012-09-24Degree:MasterType:Thesis
Country:ChinaCandidate:H Q ShaoFull Text:PDF
GTID:2189330332475603Subject:Project management
Abstract/Summary:PDF Full Text Request
In current society, the program management is very important for a company to run smoothly. Now with the development of society, the requirement of product from company is higher and higher. At the same time, the development timing is shorter and shorter. How to run a company to make shorter and cost down has became a key of key factor for the development. So the timing development is becoming strategic significance. In this file, the author made a example of the running program in current company, through the TOC to claim the effective of this way. At the same time, it also describes the development status in the outside. Also it introduces the theory of TOC and basic theory. The author analysis how to build the program management model and also bring forward 3 main key acts..The last is the author analysis the abuse of normal timing program management way. The author makes a program timing using the normal way. Based on this, the author builds the program model through the theory of TOC. The new timing is 14 weeks less than the normal way.At last the author makes an expectation of the TOC development.
Keywords/Search Tags:TOC, Program management, Timing plan
PDF Full Text Request
Related items