| Accompany with the enlargement to the investment of engineeirng constructiondevelopments of water injection of Yan Chang Oilifeld,the engineeirng projects will beincreased day by day. The projects refer to foundation treatment, the ground construction,equipment installation, pipeline laying, the large amount of engineeirng, long constructionpeirod and many other influence factors. From a water injection stations that have been putinto use,there are a lot of quality problems in the using and the destruction rfom windblowing, the rain and the sun for a couple of years. And the reasons of quality problems aremostly in the construction process. Therefore, in the process of construction, only from thecorrectly configure construction management elements and adopt scientific managementmethod, stirctly control quality in construction stage, so as to achieve the use of functionand quality standards of the project what we have expected,to build a high-quality YanChang Oilfield water injection station engineeirng.This paper on the subject of quality control in construction of Yan Chang Oilfieldwater injection station, which is studied systematically.This paper based on the relevantresearch literatureof quality control of engineeirng project at home and abroad,end researchsituation of Project Quality Control about Yan Chang Oilifeld water injection station.According to relative theory and methods of Project Quality Control.Puts forward the maincontrol point of Yan Chang Oilifeld water injection station project construction, points outthe content of the quality control process,use TQM end PDCA circulation method toanalyse the problems which exist in the currently quality control of Yan Chang Oilfieldwater injection station projects, and put forward valid improvement measures. Hope toimprove the construction quality of Yan Chang Oilifeld water injection station,so as toachieve the quality goals what we expected. At the same time, we hope that the other waterinjection stations of Yan Chang Oilfield can obtain some signiifcance references rfom thispaper... |