Research On Schedule Plan And Control For Independent Development Project Of DCR Process Control In Bao Company

Posted on:2011-12-31Degree:MasterType:Thesis
Country:ChinaCandidate:J Y GuoFull Text:PDF
GTID:2181330467978194Subject:Project management
Abstract/Summary:PDF Full Text Request
Science&Technology development project is widely used in enhancing technology level, products quality and management level. It is also one of the most numerous projects. One of the fundamental task of it is effective control and plan of development progress which can direct to setting target. The theory of project management provides the theoretic basis for development project management and ensures it become more and more systematic and scientific. The practices of development project management provide the important experience to the development of the theory of project management.Double Cold Reduction Process Control Independent Development Project of Bao company is significant. It is one of the most important programs to expand the product mix and improve product competitiveness of Bao company. It is not only the project for DCR process control but also the one of emphasis of integrated quality management in Bao company. It is the basis of Advanced products quality planning in iron-making for sophisticated and high-valued products. Thinner product, process control, including,the tension,the emulsion and the roll, is more difficult in production of food-use products. Under the condition that the DCR manufacture control system has realized large scale production, the research on schedule plan and control of the DCR process control independent development project is important and necessary.Based on project management knowledge, taking the DCR process control development project as object, the thesis expatiates the application of theory, process and means of project plan and control in development project practice. The text begins with introduce of preliminary work involving progress plan and control. Considering the reality, the owner establishes the effective project organization, assigns the participants duties and sets up the communicating mechanisms. It ensures the organization and means for project schedule management. Then, the text expounds the schedule plan and control. These secondary schedules are grounding on the arterial schedule--general schedule plan. The process control function model design schedule is drawn through breaking down the work of project. The internet equipment purchasing and software programming schedule is drawn on the principle of giving attention to the program. The software programming network schedule is drawn by optimizing the time limit for this project and analyzing the connection of work. Relevant appurtenant schedules are also built. The diversiform controlling measures are adopted in the project progress with the control organization. With the strict control on the process control function model design schedule and procurement schedule, the report-table of actual schedule and compositive progress rate are adopted to analyze and contrast the actual construction schedule with the plan. The general schedule is assuring with the dynamic inspect and updating the relevant schedule plan. Finally, it analyses the problems in the project progress and provides the corresponding solving measure.
Keywords/Search Tags:Project Management, New project, Independent Development of Process Control, Schedule Plan, Schedule Control
PDF Full Text Request
Related items