Font Size: a A A

Research On Shandong Energy Group Of Coal Mine Production System Diagnosis Project Management

Posted on:2015-09-19Degree:MasterType:Thesis
Country:ChinaCandidate:Z X WangFull Text:PDF
GTID:2181330467460967Subject:Business administration
Abstract/Summary:PDF Full Text Request
The mine site conditions, various production link, the system is complex, the management difficulty is big, the production system is a system to support, transportation, ventilation, drainage, communications, water supply, power supply, air pressure etc. the system consists of a comprehensive system, the normal operation of each subsystemcan ensure the whole production system’s stability, but at present the whole production system in the normalproduction and operation in the process of supervision, lack of mechanism of effective diagnosis.In this paper, through the research technique of diagnosis for coal mine production system, aimed at establishing adiagnosis of mechanism of coal mine production technology management, analysis and diagnosis purpose to determine the diagnostic content, according to diagnosis has established the stakeholders energy group, the mining group, the mine, the external expert-, composed of the leading group, diagnosis of project management diagnosis expert group, organization service group, on-site implementation group and other institutions, science formulationincluding the development of project implementation plan, the preparation of the outline, called diagnosis project kick-off meeting, delimit diagnosis process, selection of diagnosis diagnosis of mine, mine development of diagnosticmanual and self diagnosis, expert on-site diagnosis, summarize the stage implementation steps reasonably, establish incentive and restraint, information transmission, operation process, feedback and evaluation mechanisms, the formation of standardized project management production system diagnosis mechanism, better play the role of the production technology of the descending of the security.The innovation of this study:first, the object of study selected the integrated coal mine complex manufacturing system. The production of coal mine is a complicated system engineering, which is composed of several subsystemsand even sun system. Each son system has certain independence, but influence each other, control, only each system to normal operation, to achieve safe production, which requires a number of professional closely. While the literature studies in general only to a son system, carries on the research technology and management from the perspective of a professional field, is the entire production system planning research report.Secondly, this study adopts industrial diagnostic method to find out the coal mine production management defect. As the object of study is elaborated, known as the body of coal mine, the complex system, the main roadway, the composition of the system equipment, pipelines, facilities have life cycle, need to use the system diagnosis way to discover problems and advance deficiency judgments, can meet the system requirements for normal operation. In addition, this research according to the realproduction system developed diagnosis outline. Diagnosis byprofessional andsystem outline combination, respectively on the mine mining, mechanical and electrical,transportation, ventilation and prevention, measurement etc. put forward the comprehensive diagnosis contentproduction system, combined with the operating conditions of the mine to analyze the theoretical foundation, created a production system diagnosis. Therefore, this research is novel and creative, but also has the certain reality.In this paper, the production system of Shandong energy group, part of the mine as the research object, to carry out research on project management technique in the diagnosis of coal mine production, the establishment of a set ofcoal mine enterprise production system diagnosis method, relating to the mine production system to conductdiagnosis, put forward the suggestion of hundreds, through on-site implementation, to improve efficiency, to reduce this effect, but also to create the conditions of mining, reasonable scientific long-term development for mine. Since then, and the diagnosis results of project management extended to the whole of Shandong energy group, so as to effectively enhance the production management level of coal mine enterprises.
Keywords/Search Tags:Coal mine, Production system, Diagnosis, Project management, Research
PDF Full Text Request
Related items