Font Size: a A A

Effect Evaluation Research Of Expressway Construction Project Management

Posted on:2007-11-19Degree:MasterType:Thesis
Country:ChinaCandidate:Z F GaoFull Text:PDF
GTID:2179360185957473Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Managing the department to need to understand to managing course and final management effect, namely the expressway construction project management twist hempen thread effect is appraised the question in the expressway construction project management course, and it is the evaluation is in progress to the synthetical effect of project management work, and all asks to going out the corresponding evaluation result as for fixed quantity and quality quota. Aspect the evaluation in the now available expressway construction project management is chiefly concentrated at economy with the technology, and to manages the twist hempen thread imitates that the research which appraised chiefly includes in effect which inspected and control evaluation and the construction course the evaluation of some one quotas, the unified evaluation system of not formation; The twist hempen thread effect assessment method is managed to the now available project item, and stopping certain tier face in the item construction mostly, assessment method adaptability is wrong, and lacks the synthetical evaluation to the scattered assessment method of selection submitted a tender such as beckoning and so on. The project management course is the course of wholeization, and the whole trends courses of project management can be divided into in five stages upright, plan, execution, control and ending. Simple ground can be concluded into the formulation plan and execution plan, in order to realize the item objective. It is doing the evaluation is in progress to project management work that the evaluation is imitated by the project management twist hempen thread. Being essentially one part which appraised after the item, being effect and the influence to appraise the project management, the purpose is the experience lesson summing up the project management to the project management twist hempen thread effectevaluation, and raises the project management standard, and finally promotes the item successfully to accomplish. With after the item appraising equally, the contrast between the result of implementation that quota and the item is imitated to appraise also with item objective and the each side Shi Ji by the project management twist hempen thread is the foundation. With whether or not definite objective achieves, whether or...
Keywords/Search Tags:Construction
PDF Full Text Request
Related items