Improvement And Application Of ORACLE ERP Implementation Estimation Method

Posted on:2011-03-15Degree:MasterType:Thesis
Country:ChinaCandidate:X H WangFull Text:PDF
GTID:2178360308450280Subject:Software engineering
Abstract/Summary:PDF Full Text Request
As to the complexity of the Oracle ERP implementation project and uncertainty of the process, it is the most effective way to reduce project risks by adopting technology, templates, best practices and management standards of sophisticated methodology in all aspects of project. One sophisticated ERP implementation methodology should not only be a complete theoretical system, but also have the feature of operability, to be able to work as the guiding role in the specific implementation. Oracle AIM (Application Implementation Method) methodology is widely used in the area of Oracle ERP implementation, and includes the methods and steps required by implementation of Oracle products.For those consulting firms and client companies who are planning or in the process of Oracle ERP implementation, it is an important indicator of final success whether have estimated the projects scale reasonably and controlled project costs at the project planning stage. One one hand, a lot of local companys will apply the advanced Oracle management thought to improve their management flow; on the other hand, industry background and business process of those companies are different from each other. It's likely to find that the standard ERP system could not meet all the needs of the client, or be inappropriate for the client actual situation, which leads to the secondary development of ERP. How to measure the development scale, arrange project resources and control project progress and cost? These issues are also the key problems of implementation projects.I researched a variety of more sophisticated implementation methodologies in the ERP industry, especially focusing on Oracle AIM. I analyzed the features of these methods, pointed out that there were still some shortcomings in methods, and suggested a new five-stage implementation method.The paper focus on the cost estimate issues of the secondary development project in the implementation of Oracle ERP, through analysis of the compatibility of AIM (Application Implementation Method) estimation method and the primary cause of the estimate deviation in actual usage process. In view of these reasons, the paper further proposed some improvement methods to present estimate model: capture the primary factors that influence development work load to improve the existing evaluation criteria; introduce the point of application as the estimate unit; eliminate the stepped sudden change problem of difficulty appraisal through linear interpolation computation adjusting application points; integrate the COCOMO II extended model application composition model to introduce the developing multiplying exploiter ability experience's factor to estimate model.The improved implementation and estimation methods could be the reference role in Oracle ERP project, and will provide the the technology, templates, best practices and management standards for all aspects of the project cycles.
Keywords/Search Tags:Oracle ERP, implementation methodology, AIM, effort estimation
PDF Full Text Request
Related items