Font Size: a A A

Development And Management Of A Remote Faulty Diagnosis System For Gas Turbine

Posted on:2010-06-03Degree:MasterType:Thesis
Country:ChinaCandidate:Y GuoFull Text:PDF
GTID:2178360272498472Subject:Project management
Abstract/Summary:PDF Full Text Request
The project, indicate a time-limited work which can create a specific product or service. It is a series of related activities worked for the specific goal and with the character of specific.The specific means the product of the project is specific, provisionality means there is a clearly start and close moment and not unending for the profect. But provisionality does not means the existing time of the project is short or the product, service of the project is temporary. The project comes to the end when make the goal or get the point that the goal is impossible. Otherwise stepwise perfect is a more character of the project means the different stages and relationship of the big project witch can be carried out in little pieces.The project management, witch put knowledge, skill, tool and technology to use on work for finishing the project. Come from the definition reaching the project gola may use the knowledge, skill, tool and technology of project management. It is an integrated organization method witch can manage the continuous operation of the project work, is management for the carry out of the project.The process,is related activity witch must be performed in order to complete a series of products or services promised beforehand.The project management consists of start process, plan process, perform process, control process and end process and touch upon 9 ken include project integration management, project scope management, project time management , project cast management, project qualitymanagement, project man management, project communication management, project stock management and project hazard management.The most projects has the same process, there will be interacted between the different processes, but the 9 ken impenetrates in the processes make the different processes contact tightly and turn into a whole. The text use the project management knowledge, from the point of view of project process management to analysis and sum up the start process, plan process, perform & control process and end process of the project for the remote faulty diagnosis system of gas turbine.Firstly, the start process introduces the background of the project:on the one hand, be used as large-scale,hige-speed rolling machine,gas turbine development is very fast, and it will be the most important brunt in the electric field ,machine driven and the ship driven and so on.in the 21th century since its high-efficiency, low-pollution, start fast and flexible etc.. On the other hand, along with the development of machine manufacture technology, the structure of machine turned complex more and more, as a result it is very difficult for the maintenance and the overhaul. How to diagnosis unusual and faulty state duly and truly in order to prevent and avoid machine failure, improve the reliability, security and validity, turn into a serious problem.Secondly, in the project plan process, there schedule the detail scheme: radicate 7 goal, the technology plan, the system structure based on OSA-CMB,the research method and the project schedule.Thirdly, in the project perform and control process indicates the progress of the project, include: the examine room built, use ZHS-2 rotor experimentation platform with trouble axis and bearing thus can simulate multi-trouble of the rolling machine; Remote diagnosis center build in Liming, and many hardware; process of system software develop, according to the reseach of gas turbine faulty mechanism,signal disposal, character pick-up, diagnosis and beforehand diagnosis, establish the system structure and develop the software.In the project close process, put the result of the project into use, make the procuct and the key technology into use, and build the remote diagnosis certer in liming and earned good comment. At the same time,in the perform process,there are other achievement such as system innovation,model & arithmetic reseach, above all is the remote monitor and faulty diagnosis system development of gas turbine, witch has high economy and society benefit. Furthermore establish the favorable theory and truth base, and has high extend value.Finally, via the study and the application of the project management process and the knowledge ken, my theory level and practice ability turn fastness and strengthen, and earned high appraise for integrating the project process management with the management of information sysyte development.There should be some oversight or improper during the process of organizing and writing the document owing to the limited time and limited experience and ability of myself, and expect your comment and correction. Thank you.
Keywords/Search Tags:Project management, gas turbine, remote faulty diagnosis, OSA-CBM
PDF Full Text Request
Related items