Font Size: a A A

Program Design For New Wind System Based On The CARE

Posted on:2008-01-14Degree:MasterType:Thesis
Country:ChinaCandidate:X JiaFull Text:PDF
GTID:2178360242960121Subject:Electronics and Communications Engineering
Abstract/Summary:PDF Full Text Request
With intelligent building in various localities throughout thecountry rapid development of intelligent building rapidly expandingdemand for qualified personnel. For this reason, many colleges anduniversities, especially the construction of electrical professionalcolleges have created Intelligent Building aspects of the curriculum, inorder to meet the community's large demand for this type of talent, butwhat is more important is to systematically and intelligent buildingbasic education, improve their theoretical level for the systemdevelopment and engineering practice good knowledge reserves, andpay attention to integrating theory and practice, and strive to cultivatein a short period of time a number of very skillful engineering staff, theformation of a high professional standards of intelligent buildingengineering team, overall raise the level of domestic intelligent building.Jilin College of Civil Engineering and information professionals,founded in 2002, and Intelligent Building laboratory built in 2004,through two years of experience in exploration and other colleges anduniversities intelligent building inspection and research laboratories,Jilin College of Civil Engineering and Intelligent Building laboratoriesshould be transported and Health, well-equipped laboratories, coversthe construction of the intelligent subsystem of advanced equipment,can be simulated demonstration of various subsystems of intelligentbuilding applications, operating at the same time allow studentspersonally, personally design function.The intelligent building subsystems, building automation control system is an important component. Building automation system (BAS)is building (or buildings) in the electric power, lighting, airconditioning, transport, disaster prevention, security, broadcastingequipment to focus on surveillance, control and managementconstituted for the purpose of an integrated system. It makes building asafe, healthy, comfortable, warm living environment and efficientworking environment, and to ensure that the economic systemoperation and management of intelligent.Automatic Control System Integration Laboratory building a newwind Building Automation and air conditioning in the two importantand complex subsystems, and its initial procedure was done by theproject prepared by the engineers, is applicable to engineeringapplications, through study and test, I mastered the generalconfiguration software prepared by the methods and steps, in thisgraduation design process, rewrite a set of applications suitable forteaching.Building Automation System electromechanical equipment(Building Automation System) to control the construction of variousmechanical and electrical equipment within the building artificialcreation of a comfortable environment for people to run for the buildingof the electrical and mechanical equipment management, conservationand utilization of the maximum energy. Building Automation Systeminto the new wind, air-conditioning control system, chilled watersystem control, system control heating, water supply and drainagesystem control, lighting control system, power system monitors, and other items, they become a complete control system. BAS system is theIntelligent Building Automation System is an important basic building.a subsystem.General Building Automation System from the scene sensors,actuators, controllers and monitoring station. These sensors, andactuators were installed at the scene responsible for data collection andcompletion of an order issued by the controller. Controller becomeDistributed Digital Controller (DDC), which distributed in the internalconstruction of the regional through Bus Controller way into a network.It controller connected with the sensors and actuators to theregionresponsible for the monitoring equipment, controller itself centralprocessing unit (CPU) can be prepared in advance by the proceduresand to complete control tasks. A monitoring station can also be anumber, when there are a number of monitoring their own workstationsform a network. Monitoring network workstations connected with thecontroller through graphical control software and database managementsoftware as the interface towards the management of the whole system.Building Automation System requirements can be automaticallyadjusted people's building internal temperature, humidity, air quality,lighting equipment and related illumination of the operation, theartificial creation of a comfortable environment, to ensure that people'shealth. Effective conservation.The Building Automation System under construction internal andexternal environment can be automatically adjusted so that allequipment in the operation under the condition of satisfying the people's demand to energy-saving mode operation. No such comparableAutomatic Control System Building Energy Saving about 30%.Improve management efficiency, facilitate people management.Building Automation System automatically controlled inaccordance with the procedure in the construction of equipment, peoplegenerally do not directly operate equipment in the field, if the need tointerfere in the system's operation may amend procedures or usemonitoring workstation control equipment manner, for the equipmentof the unusual circumstances, controlled Alarm systems canautomatically. This will allow the management of the work efficiencyhas been greatly increased.Compared to the general mechanical and electrical equipmentcontrol system, the Intelligent Building on the Building Automation(BA) to newer and higher requirements, and is manifested in datacommunications and highly integrated management of the two aspects.In data communications, system requirements have not only fast, andwith higher reliability and anti-jamming capability. In a comprehensive,they are required extensive system deep-level management in thebuilding of equipment to enable these devices not only meets the basicuse of the building requirements, but also the operation and deploymentof flexible capacity, strong fault and accident prediction and processingpower, and maximize energy conservation.High efficiency, safety, comfort and convenience is the intelligentbuilding (IB) of the four major advantages. 4:00 concentratedexpression of this in today's information industry, architecture control technologies and the further integration. At the same time, people'squality of life demands a concentrated expression of the improvement.The new civilization brought about by the new way of life so thatintelligent building in the current unprecedented rapid development.According to incomplete statistics, the domestic intelligent building hasbeen built around more than 3,000 buildings, about 1,000 buildings,including Shanghai, Beijing about 600, about 800 of Guangdong,Jiangsu about 400. These have been completed and 180m above thebuilding in the end of the last century to achieve 35, in the hugeinvestment in building intelligent systems account for a largeproportion. And in the new century in the construction industry needsmore intelligent system will be immeasurable. It can be said that thedevelopment of intelligence in the construction of its inherentadvantages of the construction industry has become a mainstream trend.Building automation control usually include central air conditioningsystems, ventilation control systems, cold and heat source controlsystem, water supply and drainage control system, sewage treatmentmanagement systems, lighting control systems, elevator operationcontrol system, the car park management systems, fire control system,security monitoring the electricity supply system and managementsystems. BA system successfully used to be centralized on the buildingmechanical and electrical equipment monitoring and management, wecan save manpower, but also raise the level of management; can alsoestablish a complete archive of equipment operation, strengtheningequipment management, develop maintenance programs to improve equipment operation the reliability; further, real-time monitoring ofelectricity consumption and achieve optimum operation, significantsavings building energy consumption, and achieved a remarkableeconomic benefits. Driven by huge economic interests intelligentbuilding owners and system integrators, equipment manufacturers haveto develop this objective, the relevant state departments havepromulgated a series of policies to guide and support, intelligentbuilding construction industry has become a hot spot.
Keywords/Search Tags:Program
PDF Full Text Request
Related items