Font Size: a A A

The Oil Extraction Factory Budget System Application Study Based On The Standard Homework Cost Foundation

Posted on:2008-09-30Degree:MasterType:Thesis
Country:ChinaCandidate:J LiFull Text:PDF
GTID:2178360218963396Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
This text introduced the problem faced by the oil extraction factory costmanagement system and the budget management system first, puttingforward standard homework cost at the same time is zero related theories ofthe budgets. Including the homework cost method, standard cost method andzero basic theories frame of the budget methods, based on knowing to buildup standard homework cost zero budget systems, and then put forwardstandard homework cost zero meaning of the budget systems, Namelystandard homework cost zero budget systems are to duct into the homeworkcost method, leading to go into zero budget methods, the result of the creativetraditional standard cost system. The morrow passes standard homework costto really settle and to standard homework cost zero construction research ofthe budget systems elaborated standard homework cost to be zeroconstruction speculation of the budget systems.
Keywords/Search Tags:Standard cost, Homework cost, Budget
PDF Full Text Request
Related items