| The summary Chong Qing is China's youngest municipality directly under theCentral Government, is the largest, most populous municipality directly under theCentral Government in the region too, During the development of the West Regions andengineering construction of Sanxia of world interest, the very important position thatthere is Chong Qing. Since directlying under the jurisdiction of in 1997, under theengineering construction and drive of the development of the West Regions of Sanxia,Economy is developed rapidly, the city size is expanded constantly, the city developsconstantly correspondingly too that form a team adjacently , The permanent residentpopulation grows from 2,870,000 in 1997 to 427 in 2001 in the urban district. 10,000.The increase of urban population brings the enormous pressure to urban traffic, it isinconvenient to go out, The vehicle gathers around the contradiction of stopping up dayby day outstandingly. Predict according to relevant materials , the urban population ofChong Qing will be 1500-18 million by 2020. Limit the topography, it is very difficultto remedy in a short time that traffic infrastructures owe a debt in the city of ChongQing, Become the bottleneck factor of restricting urban development. The development history of reviewing every country in the world, since the initialstage of the 20th century till now, nearly 100 years, The traffic is the difficult problemwhich the puzzlement city develops throughout . The experience succeeding both athome and abroad tells us , should solve the problem of urban traffic fundamentally,Must pay close attention to developping traffic of urban track , so that theomni-directional, multi-channel settlement difficult problem of urban traffic. Therailway is the important part of the track traffic, have security, fast, comfortable, largecapacity, all-weather characteristic, It evacuates large quantities of the flow ofpassengerses within short time solve city the effective supplementary means of traffic. The area of Chong Qing possesses better railway transportation resources, on thebasis of carrying on feasibility study, Utilizing the rail facility that will have now andcome into operation soon, the supplementary means as the traffic of urban passengertraffic, It is a simple and convenient, economic feasible way. |