| The key water control project of Ge Zhou Bai is the first irrigation works which has been built in the main stream of the Yangtze, it is the regulation reservoir of the key water control project of the Three Gorges too. With marketization of electric power manage, the quality of electric power products required by people is improving day by day. In 2003, the key water control project of the Three Gorges will operate, which This need a safeguard system that adapts to the pivot equipments and facilities overhaul urgently, and setting up one relevant computer system to assist managing mechanism of overhauling and running with hydroelectric power plant, to make the management level of overhaul stride forward to the world first-class standard.Firstly, this text analyses the current situation of overhaul both at home and abroad, it also summarizes and analyses the experience and message of overhaul with Ge Thou Ba hydropower station over the past 20 years. Secondly, the article proves the complexities of centralize overhaul and technology and management with two hydropower stations; the task is arduous; it needs the powerful supporting of the overhauling information management system. This text realities, it has proposed the designing principle of the overhauling information management; carried on demand analysis; designed the overhauling project of the information system logically; it also simply introduces the assists analytical method and model by the management information system with the overhauling project.The designing and studying of Ge Thou Ba-Three Gorges centralized-overhaul model, has based on the combination of theoiy and using unify. It not only offers one model for running the power station now, but also offers the guide for power plant construction of the management information system and business decision of overhauling management. |