Font Size: a A A

Research Of Intelligent Information Management And Analysis System For The Construction Monitoring And Measurement Of Tunnels

Posted on:2009-09-15Degree:MasterType:Thesis
Country:ChinaCandidate:X P LiFull Text:PDF
GTID:2132360242485591Subject:Bridge and tunnel project
Abstract/Summary:PDF Full Text Request
Monitoring measurement to the scene is an important component of New Austrian Tunneling Method, developing of Monitoring Data Processing Software Combined with Surrounding Rockmass Classification and Early Warning accords with the need of tunnel construction , is also the development direction of information construction of the tunnel.1. This paper discusses the concept of tunnel information construction, presents a simple introduction of the basic principles and methods of Surrounding Rock-mass Classification and Early Warning , and describes the technology of monitoring and survey in detail, including monitoring theory, project and method .2. A simple introduction of the software development process. This paper conducts the requirements analysis of the software, points out that the aim of developing this software is to assistant decision making and improve efficiency of monitoring measurement. Meanwhile, determines the function scope of the software system , provides the global Function Structure Chart , global Technology Roadmap and Technology Roadmap of each functional module .3. This paper introduces the exploitation and principle of graph visualization module.It is puted forward that for the development of graphic module, a graphic base classes is first established, which other Graphic subclasses are the succession to( illustrated line , round , node and unit ) .4. A detailed introduction is given the algorithm for generating elements, which is reasonable and effective and is operation simple convenient.5. It is described in detail that how to develop management module on monitoring data, Surrounding Rock-mass Classification and Early Warning. First to analyze functional requirement of the system, then to design Data Structure and establish operating interface, Finally to develop data processing procedure.6. The Formulation and Software Architecture of the software system is tested to be reasonable by way of the actual engineering application ,and the rationality of the data processing flow has been verified.
Keywords/Search Tags:highway tunnel, monitoring measurement, information design, software development, surrounding rock classification, surrounding rock classification early warning, graph visualization
PDF Full Text Request
Related items