As the quick development of society and the economic, it starts to build the high speed railway in the country. Building the high speed railway will also bring some problems. Firstly, building the railway station needs a lot of land which will worse the land's situation of the cities; secondly, building railway stations will change the city traffic which will worse the city traffic. In order to use the land reasonably and solve the problem which is going with construction of the high speed railway, the research on the linking up between city traffic and railway will make sure that less land will be used and it will not affect the city traffic to building the station.In order to solve the problem, two things should be focused on. One is about the planning, constructing and running on the station; the other is traffic joint planning in the area where the station is. The further research on these problems will offer important evidence to traffic planners and erectors. But the thesis focuses on the second problem.The thesis firstly analyses the high speed station and the city traffic. The research on the problems above is the basement and key point to make a good traffic joint planning.One of the keys about the thesis is traffic demand forecast after analyzing the problems above. Traffic demand forecast include two parts: one is the demand forecast of high speed railway station; the other is traffic demand forecast of the planning area. The right traffic demand forecast is a necessary factor for the planning.After finishing the traffic demand forecast, there is particular analysis of the traffic joint planning on the area. The analysis of the planning is two parts: one is macroscopically analysis and the other is microcosmic analysis. The macroscopically analysis focuses on the orientation of the planning, the planning principle and the balance between the traffic supply and demand. The factors above are critical problems of the planning which are definitely the key to the success. The microcosmic analysis is the specific analysis of the planning which includes the structure of the joint traffic, distribution of joint traffic and so on. The research on the factors above is very important for the judgment of the planning. In the end of thesis, the traffic join planning of the Shahebao station is taken as an example. |