Font Size: a A A

The Research Of Project Cost Management And Investment Control Of The Significant Joint Venture Railway Construction

Posted on:2007-03-26Degree:MasterType:Thesis
Country:ChinaCandidate:L M LiuFull Text:PDF
GTID:2132360212960509Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
In the joint venture railway construction, project cost management and investment control directly affect the realization of the three project construction goals: quality, the time limit for a project and investment, especially to investment goal. And it is also the key to enhance the benefit of project investment. Therefore, it is very important to joint venture railway construction for corporation.Handan-Jinan Railway, the single-track railway, west from Jing-Guang Railway Handan south station, east pass through Jing-Jiu Railway Liaocheng north station, to Jing-Hu Railway Yancheng north station, spans 231km. It is invested 3.7 billion Yuan, and it is national "95" significant construction project. Han-Ji Railway is invested by joint venture of the Ministry of Railways, Shandong province and Hebei province government. According to the request of 《The Corporation Responsibility System of Construction Project》, 《Joint Venture Railway Administration Means》, 《Law of Corporation》,it is implemented project corporation responsibility system in HanJi Railway construction, and the project corporation is HanJi Railway Corporation Limited, which has 1.7085 billion Yuan capital in cash. HanJi company is responsible for the whole process of raising capital, the project construction, the operation management, repaying the loan and the interest, the property maintenance and increment. The survey and design of this project is undertaken by The Third Railway Survey and Design Institute. The Third Railway Survey and Design Institute completed preparatory survey and design in 1996, and in the same year carried on complementary preparatory survey and fixed survey according to the examination opinion of the Ministry of Railways. And the technical design was completed in January, 1997. In the end of 1996, HanJi Railway Corporation Limited was established, and the Ministry of Railways and the two provinces leaders laid a foundation for the start of HanJi Railway's construction. The entire line began to officially construct in 1997, temporarily operate in July, 1999, and officially operate in 2000.At the beginning of the establish of HanJi Railway Corporation Limited, the...
Keywords/Search Tags:joint venture, railway construction, project cost management, investment control
PDF Full Text Request
Related items