Font Size: a A A

Optimum Research Of Power Network In WuXiang

Posted on:2006-12-03Degree:MasterType:Thesis
Country:ChinaCandidate:Q B ShenFull Text:PDF
GTID:2132360152982940Subject:Power system and its automation
Abstract/Summary:PDF Full Text Request
With national economy and peoples' demand for electric power increasing continuously, the electric network of Wu Xiang County can't fulfill the need of the load' s going up. For guaranteeing the national economy' s growing in the future, except for power plants should be built and rebuilt, the spread and reconstruction of network hold the balance in front of the decision-makers as well.The author summaries the research based on actual undertaking job of network programming and explains the actuality, problem of the electric network in Wu Xiang County. At the same time, the author describes the goal and principle of reconstruction. According to the author's work experience, the actual example of programming is given. Otherwise, the author discusses some key technology problems used in electric network programming.
Keywords/Search Tags:power system, planning of power network, power market, power flow calculation
PDF Full Text Request
Related items