Font Size: a A A

Management and non-supervisory perceptions surrounding the implementation and significance of high-performance work practices in a nuclear power plant

Posted on:2001-10-15Degree:Ph.DType:Dissertation
University:The University of ToledoCandidate:Ashbridge, Gayle AnnFull Text:PDF
GTID:1462390014955510Subject:Business Administration
Abstract/Summary:
Change management has become an imperative for organizations as they move into the 21st century; up to 75 percent of change initiatives fail. Nuclear power plants face the same challenges as industrial firms with the added challenge of deregulation. Faced with this challenge, restructuring the electric utility has raised a number of complex issues. Under traditional cost-of-service regulation, electric utilities were able to pass on their costs to consumers who absorbed them. In the new competitive environment, customers will now choose their suppliers based on the most competitive price.;The purpose of this study is to determine the degree of congruence between non-supervisory and supervisory personnel regarding the perceived implementation of high performance workplace practices at a nuclear power plant. This study used as its foundation the practices identified in the Road to High Performance Workplaces: A Guide to Better Jobs and Better Business Results by the U.S. Department of Labor's Office of the American Workplace (1994).;The population for this study consisted of organizational members at one nuclear power plant. Over 300 individuals completed surveys on high performance workplace practices. Two surveys were administered, one to non-supervisory personnel and one to first line supervisors and above. The determination of implementation levels was accomplished through descriptive statistical analysis.;Results of the study revealed 32 areas of noncongruence between non-supervisory and supervisory personnel in regard to the perceived implementation level of the high performance workplace practices. Factor analysis further revealed that the order in which the respondents place emphasis on the variables varies between the two groups.;This study provides recommendations that may improve the nuclear power plants alignment of activities. Recommendations are also provided for additional research on high-performance work practices.
Keywords/Search Tags:Nuclear power, Practices, Performance, Implementation, Non-supervisory
Related items