Font Size: a A A

Design And Implementation Of Operation Performance Appraisal System In A Power Plant

Posted on:2016-11-07Degree:MasterType:Thesis
Country:ChinaCandidate:Y G HeFull Text:PDF
GTID:2298330467995803Subject:Software engineering
Abstract/Summary:PDF Full Text Request
In order to guarantee the safety operation management power relatedequipment, improve the economic, environmental benefits of powerplant, a power plant is put forward according to operating all-roundduty and equipment maintenance management work, establish performanceappraisal management system operation, to related personnel pershift, responsibilities for operation of performance appraisal, andthe appraisal result and the salary and welfare hook overall, therealization of the safe operation of the power plant, reduce powerplant energy consumption, further improve the economic benefit and theenvironmental benefit of power plant.In this thesis, through the analysis to the operation of theperformance evaluation of a certain power plant users, determine theoperation of power plant performance appraisal system usersinclude power plant general manager, deputy general manager, chiefengineer, factory leader, each department manager, general staff etc..According to all levels of management and staff work requirements, thefunction, the power plant performance appraisal information systemshould include the basic setup, management, assessment model assessmentindex, operation index management assessment and daily managementmodule. Setting module is based on the basic functions of the systemsettings, consists of evaluation model for energy assessment anddynamic management, routine examination of three mode; managementmodule of evaluation index of evaluation index of informationinput, set the scope of examination, the distribution of negativeevaluation; operation is timely assessment of the operation conditions of the power module equipment, boiler and steam turbine and other dailymanagement appraisal; appraisal management module is the plant staffdaily work behavior and attitude etc..Power plant operation performance appraisal system is developed byusing Microsoft Visual Studio2008platform, using C#language as thedevelopment language, SQL Server2008database system, and theMicrosoft.NET Framework SDK v.3.5runtime environment.This system uses the data from the power plant SIS real-time database,two tickets system, defective system, inspection system, theconstruction of this system includes data acquisition data of staffperformance management in power plant test data and test pointsof manual input. Power plant operation performance management systeminvolves entities include information, unit information, personnelinformation, assessment index, assessment model and schedulemanagement appraisal, operation index, major operation, measuringpoint, evaluation project.The design and implementation of the system, has passed the systemtest, the software system of comprehensive test, test casedesign systemusing the equivalence class partition, boundary value method, the testresults prove that, the operation of power plant performance appraisalsystem can meet the design requirements and follow the system design, theactual results in line with expectations.After the development and practice of several months, the system hasbeen launched, and a performance evaluation of information interactionplatform in a power plant, the system has been initially have the abilityto actually use.Through the development of a certain power plant operationperformance evaluation system, my theory and the practice application ofinformation system development have a deeper understanding, the successof the learned knowledge of computers and corporate practice. At the same time, in the process of system development, through constant groping,learning, and my knowledge of database, C#language, ASP.NET and otherrelated technical knowledge also had a deeper understanding.The design and operation of performance appraisal system in a powerplant has achieved certain success, but also should be improved andperfected the system constantly.
Keywords/Search Tags:power plant, performance management, .NET
PDF Full Text Request
Related items