Research On Risk Management Of Comprehensive Budget Management Information System Construction Project Of SHOUGANG Group

Posted on:2022-11-22Degree:MasterType:Thesis
Country:ChinaCandidate:L ZhuFull Text:PDF
GTID:2531306917481874Subject:Project management
Abstract/Summary:PDF Full Text Request
With the deepening of reform and strengthening the efficiency of operation and management of SHOUGANG Group,the comprehensive budget management information system construction project of SHOUGANG Group came into being,aiming at improving the budget management system of the group and enhancing the scientificity and preciseness of budget management through the successful construction of the project.As the leader of the group’s information deployment in the new stage,it is faced with multiple pressures,such as lack of project experience,complex project development content,attention from other subsequent system projects,so project risk management is particularly important.This paper takes SHOUGANG Group comprehensive budget management information system construction project as the research object,uses the method of analysis and reading literature to find out the theoretical method suitable for the project risk management research,and then according to the actual situation of the project,uses the selected research methods to carry out qualitative and quantitative risk analysis,and invites relevant experts to conduct on-site scoring or discussion according to the needs of risk research The research process and results were evaluated.According to the main content of project risk management,this paper uses the relevant theory of project risk management,and according to the process of risk management,carries out risk management research from four aspects:risk identification,assessment,response and risk monitoring.By analyzing the characteristics of project risk,this paper analyzes and compares the commonly used project risk identification methods,so as to select specific methods for project risk identification,and obtains 7 types of risks such as design and construction,and 17 specific risk factors such as basic information and personnel flow.At the same time,this paper compares and analyzes the current project risk assessment methods,selects the quantitative calculation method combined with the characteristics of the comprehensive budget management information system construction project,builds the model and carries out the calculation according to the method requirements,and finally draws the conclusion that the comprehensive budget management information system construction project risk is moderate and can be carried out.According to the results of project risk identification and assessment,the paper puts forward targeted risk response measures,and finally carries out risk monitoring according to the above contents.According to the research results of project risk management in this paper,a more systematic project risk management process and method is established in practice,which effectively improves the risk management ability in the process of project development.On the one hand,it provides guarantee for the successful implementation of comprehensive budget management information system construction project,and also provides feasible mode and successful experience for subsequent implementation projects of Shougang.
Keywords/Search Tags:risk management, risk identification, risk assessment, risk response
PDF Full Text Request
Related items