| The test process of the power system is tedious,the test analysis process is complex,the lack of preparation of the test process and the misoperation of the testers will lead to the test failure and reduce the test success rate,and some misoperation may even cause damage to the test system or serious accidents.And the power system test has the characteristics of many times,high repeatability,numerous and complicated data files and the need for multi-department cooperation,which can easily lead to the isolation of information,the inability to effectively accumulate test knowledge and the difficulty of coordination among managers.The use of computer simulation technology to simulate,study and optimize each test process can effectively improve the work efficiency of the testers and the success rate of the test,and avoid accidents.Through the electronic highly integrated management and control platform,the management and control ability of managers can be improved.For this reason,aiming at the power system test,a special test optimization and management software is developed by using modular design.First of all,this paper investigates and studies the relevant background and research status of power system test optimization and management at home and abroad,and analyzes the problems existing in the test process,and puts forward the research content and goal of this paper.Combined with the analysis of the current development technology of the information system,the.NET platform,Cpact S development mode and SQL Sever database are selected to develop the application architecture,data architecture and infrastructure of the system from the technical and application requirements of the system.The core functional modules of the system are introduced,and the corresponding main business processes are analyzed in detail through the flow chart.The use case diagram is used to show the system use case design,analyze the relationship between the two entity objects of the user and the document,draw the Emurr relation diagram of the system,complete the design of the system database,modularize the core business of the system,and finally carry on the detailed software test. |