Research On Problems And Countermeasures Of Rural Highway Cost Control In Longchuan County

Posted on:2020-12-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y H XieFull Text:PDF
GTID:2512306200451174Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
After entering the new century,our country has increased its support to the investment of rural infrastructure,but the influence of various factors has led to a lot of problems in the construction of rural roads,such as the low management level of construction personnel,the weak technical force and the shortage of funds.In order to improve the rural highway construction management level and control the rural highway construction cost,it is necessary to study and investigate the existing problems in the current highway construction mode and the cost control process in order to improve the rural highway construction management level and to control the rural highway construction cost.The causes of the problems are analyzed and the corresponding policy suggestions are put forward to promote the construction of rural roads And the performance is improved.In this study,in order to study the problems of the control and management of the cost control of rural roads,a case-based approach was adopted to study the rural highway in Longchuan county as the object of the concrete analysis.The method of case study is used to investigate the main problems existing in the process of construction management and cost control of the rural roads in Longchuan County,and to analyze the causes of the problems and to put forward relevant suggestions.The full text is divided into five parts: the first part introduces the background,purpose and significance of this study,the summary of the present research situation at home and abroad,the main research contents,the research methods and so on.The second part of the construction of rural highway project This paper introduces the concept and the theoretical basis of the cost control,first analyzes the basic concept,characteristics and overall development status of highway engineering and the three control targets of project management.The common mode and selection method of project management of rural highway engineering construction are also described,and the concept,mode and process of cost control are analyzed.The third part comprehensively considers the development status of the construction management and cost control of the rural highway project in Longchuan County,and expounds the development situation of theproject,the division of relevant functions and functions,and then analyzes the flow of the construction and cost control of the highway project.The fourth part,through the analysis,found the rural highway project construction in Longchuan County There are some problems in the process of setting up and cost control,such as the lack of cost competition consciousness,the lack of consideration of the market factors and the imperfect supervision and assessment mechanism.In view of these problems,based on these problems,a corresponding solution is put forward in the fifth part,such as building the consciousness of cost control and construction management,strengthening the cost consciousness,selecting the appropriate construction management and the cost control method.Through the study,it can be found that there are many problems in the cost management process of the rural highway construction in Longchuan County,and after the corresponding measures have been adopted,the obvious results are obtained,and the cost control management will be explained.Sex and importance.
Keywords/Search Tags:rural road, construction management, cost control, Longchuan County
PDF Full Text Request
Related items