Font Size: a A A

Schedule Management Of Smart Road Project Of DI Company

Posted on:2022-11-02Degree:MasterType:Thesis
Country:ChinaCandidate:J L ZhengFull Text:PDF
GTID:2492306782993359Subject:Economy of Traffic and Transportation
Abstract/Summary:PDF Full Text Request
In recent years,with the gradual prominence of resource depletion,environmental pollution and climate warming,the application of clean energy has become an inevitable trend of energy transformation.The Chinese government has given a lot of policy support for the application of new energy.The smart highway construction integrated with new energy and emerging technologies has subverted the traditional highway construction.Modular production of highway greatly reduces the time of outdoor work,and provides new ideas for the construction of new energy smart highways.Through the above background description and the collation of relevant theoretical knowledge,combined with the DI Company’s own situation,and using tools such as Project Management,WBS decomposition and Project Software to study the construction progress management of smart highways by combining practice and theoretical analysis.First of all,the basic analysis of the smart highway is carried out,the overall design scheme after the completion of the smart highway is given,the various functions that can be realized by the smart highway are shown,the functional characteristics of each module of the smart highway and the working principle of the overall operation are clarified,the difficulties of smart highway construction progress management are analyzed,and the urban development with smart highway is clarified.The outlook of the construction of smart roads looks forward to the development of the smart highway industry.Secondly,through the study on the construction progress management plan of smart highways,the general idea and principles followed by the construction progress management plan are clarified,the intelligent highway operation flowchart is drawn,the smart highway construction work is decomposed by WBS,the PERT method is used to calculate the completion cycle of each work,and the work is filled in the WBS decomposition table for the cycle,use the Project Management Software project to deepen the design of the construction progress scheme,use Gantt diagrams to display the construction progress,find the longest construction cycle in the software,that is,the key path of the project,and use the network diagram to display the work of each node.Finally,through the guarantees of organizational,financial and technical support measures we will ensure the smooth implementation of the construction progress management of smart highways.The organizational guarantee gives the organizational chart of the construction unit and the production enterprise,and clarifies the responsibilities and main tasks of each department;the financial guarantee measures clarify the source and use principles of funds,and clarify the specific management measures of the funds;the technical guarantee measures are the technical management system with the technical project manager as the main person in charge.The organizational chart of technical management is given and the guarantee rules of technical management are clarified.Through the study on the construction progress management of smart highways advance preparations have been made for the project construction progress management,ensuring that the construction progress can be carried out in accordance with the construction progress plan,ensuring that the construction unit completes the construction tasks efficiently,reasonably controlling the construction cost and improving the economic benefits of the construction unit.
Keywords/Search Tags:Smart roads, project management, project design, schedule management, Implementation guarantee
PDF Full Text Request
Related items