Font Size: a A A

Design Of Power Acquisition System Based On DCS

Posted on:2022-02-26Degree:MasterType:Thesis
Country:ChinaCandidate:G HouFull Text:PDF
GTID:2492306320450394Subject:Control Engineering
Abstract/Summary:PDF Full Text Request
With the continuous improvement of production technology and automation,the coal consumption index of cement companies shows a downward trend year by year,but the comprehensive electricity consumption of cement still shows an increasing trend,and the electricity consumption costs of enterprises remain high.Electricity cost accounts for a large proportion of the operating costs of enterprises Proportion,and if a malfunction occurs during the operation of the equipment,it may cause abnormal power consumption.In order to better solve the problem of abnormal electricity quantity,this topic proposed the JX-300 X distributed control system as the basis,applied to the cement plant in the production process of electricity collection and monitoring application technology design.The system design is combined with the production line of the cement factory,and the upper computer monitoring system is completed by means of configuration software to monitor the specific process of the production site.The system conveniently and quickly monitors the on-site situation through the dynamic and intuitive on-site monitoring and display interface,so that the system dynamically changes with the on-site conditions,reducing the technical requirements for the operator,reducing the labor intensity,and improving the control process.Realize the real-time collection and monitoring of electric energy consumption in every link in the operation process of the cement plant,and can realize the real-time monitoring trend curve of production,analysis data dynamic display,accident alarm,production report browsing,printing and other functions.The research results show that the application of the JX-300X-based cement plant power collection system in the production process of the cement plant impractical and feasible.The application of this system monitors the abnormality of the power on the production site,and can also effectively monitor production The consumption of electrical energy in the process helps to analyze the electrical energy consumption of the cement plant,lays the foundation for further energy-saving measures,and is conducive to the control of input costs in the production process of the enterprise.
Keywords/Search Tags:JX-300X distributed control, electricity collection, cement plant, configuration software
PDF Full Text Request
Related items