Font Size: a A A

Research On Schedule Management Of Water Purification Project In QCS Reservoir

Posted on:2020-02-28Degree:MasterType:Thesis
Country:ChinaCandidate:Y C YinFull Text:PDF
GTID:2491306353960849Subject:Project management
Abstract/Summary:PDF Full Text Request
Project schedule planning and control is the most important content of project management.Its fundamental purpose is to determine the deadline requirements of project operation,control the time of project operation,and make all activities of the project as a whole,so as to ensure that the project can be completed on time.It is an important part of project management to scientifically and reasonably formulate project schedule and control it.It plays a great role in achieving project objectives.In the QCS reservoir water purification project,there are a lot of substances to be inspected.At the same time,it has the characteristics of different detection methods,high technical difficulty and wide coverage.Whether the development of detection methods can be completed in time and the construction of a sound prevention system still has some unknown and uncertainties.Therefore,project schedule management plays a very important role in the implementation of the project and has a high application value.It can not only produce higher economic and social benefits,but also has great practical significance to improve the management level of water supply industry.In this paper,the QCS reservoir water purification project is selected as the research object.Based on the theory of project progress management and research methods,relevant data and data are collected and sorted out.Driven by facts and data and guided by practical needs,the process of QCS reservoir water purification project in progress management is analyzed in depth,and WBS method is used to organize the structure.Detailed elaboration of responsibility and specific content,sorting out the relationship between elements at all levels,building a sound framework of progress management system,determining the basic principles of its system,defining the target scope and time requirements of the project,establishing the basic principles and contents of compiling the project progress plan,and formulating the project progress plan,which involves the division of functions and responsibilities,work breakdown and work schedule.Sequence and time limit estimation.Complete the research work of project progress control and related measures of QCS reservoir water purification project,introduce the basic principle of its control,construct two-stage dynamic monitoring mechanism and control mechanism in actual project,give effective measures and suggestions to control project progress,summarize the project schedule control scheme design,and then ensure the smooth completion of the project.This paper deeply analyses the requirement of QCS reservoir water purification project for project schedule management ability and level,which plays an important role in the dynamic management of project schedule,the improvement of project scientific research management and control ability and the efficient allocation of resources.It can not only effectively solve the complex problem of high-level technology for scientific research projects,but also has a high level in practice.Operability can provide some reference and experience for other reservoirs in water quality research and treatment.
Keywords/Search Tags:QCS reservoir, progress management, plan compilation, progress control
PDF Full Text Request
Related items