Font Size: a A A

A Research On Production Management Optimization Of The Finishing Workshop In FBE Company

Posted on:2021-08-23Degree:MasterType:Thesis
Country:ChinaCandidate:S WangFull Text:PDF
GTID:2481306557491064Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Viscose fiber is a kind of regenerated cellulose fiber,which belongs to the range of biomass fiber.It is an important chemical fiber product for the sustainable development of circular economy.In recent years,the production capacity of domestic viscose industry has increased rapidly,the competition among peers has intensified,and the government's environmental protection policy has been tightened year by year.How to improve the competitiveness of traditional products and accelerate the research and development of high-tech products is a problem faced by every domestic viscose enterprise.FBE company is mainly engaged in the production and sales of chemical fiber products.The finishing workshop is responsible for processing Cake silk into cylinder silk,grading,packaging and warehousing.Its production management ability directly affects the quality of the company's products,and then affects the company's market competitiveness.This paper first summarizes the relevant research results at home and abroad,summarizes the production management and its main contents,common methods and typical production management activities;then analyzes the production management status of the finishing workshop of FBE company,and discusses the problems existing in the production and operation process,mainly including the quality problems caused by the silk cake falling off the ground,the customer complaints caused by the low moisture regain of the silk cake and the cylinder,and the staffing Secondly,the industrial engineering method is used to analyze the problems of silk cake landing and moisture regain in the weak link of production management.On this basis,the paper puts forward the optimization design scheme of production management of finishing workshop,such as improving the silk transport flat car and its use method,installing temperature control humidity box in the moisture regain adjustment room,and puts forward the set shift management,electronic monitoring and control,etc Based on the analysis of post workload,this paper puts forward the optimization scheme of the arrangement workshop personnel allocation,and improves the workshop productivity and efficiency through a series of measures such as strengthening the labor competition,the management of teachers and apprentices under the new mode,and establishing and improving the supervision and assessment mechanism.Finally,it analyzes the implementation effect of the improvement scheme for the weak links of production management in the sorting workshop.The results show that the economic benefits have been improved and the income of employees has been significantly increased.The implementation of the production management optimization scheme has basically achieved the goal of reducing cost,increasing efficiency and enhancing the market competitiveness of enterprises.
Keywords/Search Tags:Finishing workshop in FBE company, Production management, Staffing, Optimal design
PDF Full Text Request
Related items