Font Size: a A A

Study On Program Risk Management Of H Company

Posted on:2021-01-23Degree:MasterType:Thesis
Country:ChinaCandidate:P LiFull Text:PDF
GTID:2439330647460932Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The research and development(R&D)of components and components for aeroengine are the most basic field for aeroengine manufacturing.required by Bureau of Machinery Industry,the key parts and components are must overcome,to solve the current situation and question of development,to move forward and push the key parts and components' technology progress,for going out the neck choked by others,for the country's need in aeroengine and the relevant machinery and equipment in full respects.But,due to the big entrance barriers to be the suppliers in domestic aeroengine parts and components market,there is very high risk in the beginning of research and development(R&D)To study risk management specially in research and Development(R&D)project in H company for domestic aeroengine airfoils,for the entrance to be its supplier with long-term purchasing order and for long time corporation operation,meanwhile,this study told the project risk management played a very high positive role,it is good for H company to expand and improve the domestic risk data in the base of foreign business risk data and continue to contribution in domestic aero manufacturing industry.This paper look back and do the summary theories and practice in work.Theoretical study is through reading many book,professional management magazine in project & project management,risk management and project risk management.Practice study is through domestic aeroengine airfoils for H company,from the beginning to the last step of this project risk management.Via the logic under the related theory,the first step is to use SWOT method to identify the risk,the second is to adopt expert scoring method to evaluate the risk meanwhile to adopt AHP method to evaluate the risk in data.the third and the fourth combined to get out the action for risk control,and how to monitor the risk.Based on the 4 steps,to ensure the success of the project.Through the intensive discuss and study for risk management on R&D project in domestic aeroengine airfoils for H company,to double check the theory's feasibility in aeroengine products,it also has the certain meaning for similar corporations that would like to put resource to domestic aerogene parts and components manufacturing market..
Keywords/Search Tags:project risk, SWOT analysis, expert scoring, AHP
PDF Full Text Request
Related items