Economic Evaluation Of Yuening Road(Yuelu Section)PPP Project

Posted on:2018-05-31Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhuangFull Text:PDF
GTID:2429330548980365Subject:Engineering
Abstract/Summary:PDF Full Text Request
Yue Ning road is a express road which docking Ningxiang county and Xiangjiang New District,The construction of Yue Ning Road will further optimize the structure of regional road network,and improve road network system of the cross area,building the new convenient transportation corridor from Ningxiang county to the main city of Changsha will strengthen the regional integration of Xiangjiang New District.The PPP project of Yue Ning Road(Yuelu section)emerges as the times require when the state promotes the construction of urbanization and promotes the introduction of social capital into PPP project.The economic evaluation in road engineering construction project based on combing the theory and understanding of domestic and international issues related to research on the status quo,combined with the project using the PPP model,first of all,the collection of Yue Ning Road(Yuelu section)technical and economic data of PPP construction project,from the perspective of government finance,the project's financial ability to pay for the analysis,and from the angle of social capital partners,through the analysis of project investment and financing,cost benefit,net cash flow,economic index calculation of NPV,payback period,internal rate of return,theIn this paper,combing the theory of road engineering construction project economic evaluation and understanding of the current situation of domestic and foreign related issues,combined with the PPP model adopted in this project,First,we collect the technical and economic data of PPP construction project of Yue Ning Road(Yuelu section),from the perspective of government finance,this paper analyzes the financial payment ability of the project.And from the angle of social capital partners,through the analysis of project investment and financing,cost benefit,net cash flow,economic index calculation of NPV,payback period,internal rate of return,the financial viability of the project and the ability of discharge were analyzed,and from the angle of social capital partners,through the analysis of project investment and financing,cost benefit,net cash flow,economic index calculation of NPV,payback period,internal rate of return,the financial viability of the project and the ability of discharge were analyzed,The analysis results show that the project financial risk can be control;secondly,feasible use method,can not influence,before and after method,cost benefit analysis method and shadow price and Shadow Wage shadow parameters of Yue Ning(Yuelu section)PPP road construction project.financial viability of the project and solvency are analyzed.The analysis results show that the project financial feasibility,risk can be controlled;secondly,the influence of law,can not,before and after method,cost benefit analysis method and shadow price The parameters such as shadow shadow wage,Yue Ning Road(Yuelu section)objectively evaluated the effect of PPP construction project on the regional development of the national economy,calculate Yue Ning Road(Yuelu section)PPP project economic net present value,the investment recovery period,the internal economic benefit rate and economic benefit cost ratio and other economic indicators are calculated,and the sensitivity analysis of the economic benefit,evaluation of the anti risk ability of the project in the aspects of economic cost benefit.Through the social impact analysis,mutual adaptability analysis and social risk analysis of the project,it is concluded that the construction of this project has significant social benefits,which has basically been supported by all the governments,departments and masses involved,and the project is feasible.Finally,the conclusion is drawn that the PPP project of Yue Ning Road(Yuelu section)is feasible and controllable.Hope to provide reference for the evaluation and decision making of similar projects,and provide reference for similar problems.
Keywords/Search Tags:Yue Ning road(Yuelu section), PPP project, economic evaluation, financial evaluation, national economic evaluation, social evaluation
PDF Full Text Request
Related items