| With the rapid development of our economy and the rapid improvement of people’s living standards,the requirements of urban residents for living infrastructure are also increasing day by day,especially the explosive growth of electronic products.People’s life has become more and more inseparable from the daily life of the demand for electricity,so in this case,the distribution project for the power supply stability and reliability requirements are particularly high.In recent years,with the rapid development of the power supply enterprise to increase the investment cost of Liaoyang area and Liaoyang area for regional economy,distribution network reconstruction project demand is also increasing,so in the process of implementation of the project to project cost control is also very important.In the reconstruction project risk control ability is not only directly determines the possibility of the smooth progress of the project,good security is the final project economic benefit.Based on the Liaoyang distribution network reconstruction project as the research object,through study of the Liaoyang for this area can play a small see big,can further to other enterprises in the industry Similar projects provide the necessary information support,and ultimately achieve the purpose of serving the people and benefiting the people.In this paper,the basic theory of project cost risk control is first expounded,and the evaluation method is proposed according to the theoretical content of risk management and control,and the corresponding cost risk control strategy is introduced.Secondly,the paper expounds the basic contents of the project cost risk control,the risk identification principle and the corresponding flow of the distribution network reconstruction project in Liaoyang area.After introducing the principle and the risk assessment model of this project is established.Finally,combined with the result of project risk assessment model,This paper analyzes the risk level of the whole project,and defends and prevents the various kinds of risks that may appear,and finally achieves the purpose of risk control for the whole project cost.The main conclusion is that the risk level of the whole project is general.The risk of cutting the project is mainly concentrated in the decision-making stage of the project,so it is necessary to pay attention to the control of the risk in the corresponding engineering stage,and the control measures of these risks are described in detail in the later part 6th. |