Font Size: a A A

The Study On The Construction Curtain Wall Detailed In Green Building Background

Posted on:2019-10-21Degree:MasterType:Thesis
Country:ChinaCandidate:J ChenFull Text:PDF
GTID:2392330590978693Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
After more than 40 years of development,the curtain wall has been widely used in super high-rise buildings and high-rise buildings,office buildings and complex buildings,and gradually adopted in high-end residential buildings.The rapid development of curtain wall in China has brought a lot of problems.Therefore,technical innovation should be driven by management to strengthen management control,especially design management should be placed in a very important position.Economic globalization has greatly intensified international industrial competition.As an important means of industrial competition,technical standard is the strategic commanding point of future social and economic development.The competitiveness and level of technical standards have become an important basis for assessing the core competitiveness of national industries.More and more attention has been paid to the application of green building in Chinese construction projects,and it is more and more common.Green buildings have become an indispensable part of the growing number of green buildings,especially new and pending projects.So early in the building curtain wall detail structure design must fully consider the green building,green building into the construction curtain wall detail structure design,so that the evaluation of the construction project in the design,construction can be to determine the level of green architecture,operating in the late construction project evaluation can still be identified as green building high grade.To achieve low cost,efficiency,economy,environmental protection,integration and optimization of construction projects.In this paper,the detailed structural design of architectural curtain wall under the background of green building is mainly analyzed and studied,and the architectural curtain wall design of different traditional projects is designed to coordinate with architectural design,structural design and late construction in stages.In the design process,the energy saving,material saving,environmental protection and pollution reduction of green buildings will be fully integrated.After the construction concept is determined,the research on the detailed structural design of the building curtain wallwill be started.The preliminary design of the curtain wall detail structure was completed in the initial design stage of the building expansion,the architectural structure design was further reviewed with the selection of system and materials,and the green building evaluation requirements were further considered into the detailed structural design.In the design stage of building construction drawing,complete the structure review of the second stage of building curtain wall tender drawing design,the design of standard and non-standard joints of building curtain wall details,and further integrate the green building requirements into the selection of bidding materials to determine bidding materials;In the structure of the building curtain wall construction drawing stage to complete the third stage review,building curtain wall detail all details of design work,eventually determine the material selection and process requirement of the actual construction and materials and through a third party laboratory testing,curtain wall system functional testing final construction materials,technology,function level and meet the requirements of green building.Through the above detailed phases hierarchical curtain wall detail structure research,finally summarized the detail structure of the three aspects: the construction curtain wall structural detail study functional detail structure,building curtain wall,building curtain wall form detail study,different from the three aspects and the traditional architectural curtain wall design,for the innovation of this paper point and has a project case.Through the above three aspects of research,the project construction can save cost and shorten the construction period of each professional connection is more reasonable,the operation cost and maintenance cost can be saved in the later maintenance stage of the project,and the function selection of the construction project is more perfect.At the same time,it also needs high design ability to carry out the detailed construction design in three aspects,which requires good design prospect and understanding and communication ability to cooperate with other majors.
Keywords/Search Tags:Green building, architectural curtain wall, detailed structure, structural details, functional details, morphological details
PDF Full Text Request
Related items