Study On Epc Heating Mode Of Henanjuangongrejishuyouxiangongsi

Posted on:2020-11-03Degree:MasterType:Thesis
Country:ChinaCandidate:Y YangFull Text:PDF
GTID:2382330575471454Subject:Senior Management Business Administration
Abstract/Summary:PDF Full Text Request
The mode of implementation of EPC is the inevitable requirement of the international market and project market.However,China's EPC mode by a short history of the development restrictions,the current international and advanced engineering EPC model still has a large gap compared.In the field of heating,the development of EPC mode is relatively not very mature.Although the property has hot commodity general merchandise,because it is a special commodity,unlike other commodities can take the form of pre-sale three packs to ensure customer satisfaction.If the temperature of the heating provided by the project does not meet the requirements,the more impossible to exchange or refund,even if the refund is not able to compensate for physical and psychological harm to the user,and therefore advance the prevention of post-heating project than make up the meaning of.The introduction of EPC mode in the conventional heating project is in order to enhance the efficiency of heating project even more significant.Based on this,this paper focuses on Henanjuangongrejishuyouxiangongsi EPC heating mode research.This article is to discuss the research Henanjuangongrejishuyouxiangongsi EPC heating operation mode issues: First,the analysis of the original heating Henanjuangongrejishuyouxiangongsi business model;the second is designed to Henanjuangongrejishuyouxiangongsi EPC heating operation mode;Third UN study risk control measures for security and heating company EPC mode.Through this study the main conclusions are as follows:(1)In order to meet the needs of market development in recent years,henanjuangongrejishuyouxiangongsi has set up in the pipe network construction and operation,internal management,heating charges have been adjusted.Improve the production and operations departments scheduling functions while before the annual heating are to communicate with customers,a modest development part of the user.Difficult to charge the common problems encountered in the heating industry,currently one of the most important sources of income but also the company.Henanjuangongrejishuyouxiangongsi at the same time focus our attention on the construction of some internal management reforms to ensure the income and contribution matching.Although a series of efforts,but Henanjuangongrejishuyouxiangongsi operation mode still has the following problems: single heating mode,the hot net loss is relatively large,low-cost efficiency,lack of professionals,poor management,the urgent need to adopt new EPC heating mode to solve the above problems.(2)After Henanjuangongrejishuyouxiangongsi heating mode using EPC targeting to take full advantage of their own use of human resources,operations,energy conservation and environmental protection to provide users with more high-quality heating services,improve customer full and full members,increase revenue and profitability,the company continued to expand business territory,toward national,and even global heating group business development,in order to achieve the objectives,targeted design of the company organizational model,investment and financing model,technology model as well as during operation.(3)EPC Henanjuangongrejishuyouxiangongsi mode heating operation mode may be at risk from policy,technology upgrades,as well as financing charges,through the development of select targeted strategies can effectively circumvent these risks and ensure EPC for geothermal projects are running.
Keywords/Search Tags:Henanjuangongrejishuyouxiangongsi, EPC, Operation mode
PDF Full Text Request
Related items