Font Size: a A A

The Research On The Schedule Control Of 35KV Power Transmission Project Of Gaoling Power Supply

Posted on:2015-04-04Degree:MasterType:Thesis
Country:ChinaCandidate:W LiFull Text:PDF
GTID:2382330572450994Subject:Enterprise management
Abstract/Summary:PDF Full Text Request
Since the reform and opening up,the country's industrial growth rate of power by leaps and bounds,as an effective vehicle for all kinds of energy-the power grid,it can effectively promote social and economic development.The transmission project as an important part of the grid,industrial and agricultural production and people's daily lives and so from its construction and development,to promote the development of national infrastructure,promote the building of a sound industrial system in the country,is building cornerstone of the country's infrastructure.3 5KV power transmission station for the most basic power system substation,especially in the surrounding areas near the 110kV substation,35kV power transmission station project settled in the country's electricity system plays an important role in connecting.The purpose of settling 35kV transmission project schedule control,that is,in order to ensure consistency and quality and timely completion of this project,the actual power transmission project schedule requirements and schedule of the project requirements,and by controlling the progress of the project activities to achieve the four goals in the progress of the project management,quality management,security management,and financial management to ensure that projects 35kV power transmission station to settle economic and social benefits.This study introduces the research background,research status,purpose and meaning,in theory theories such as project management and project schedule control,project schedule control principle where the three elements of the project schedule control review to GaoLing supply Branch settle 35KV power transmission project as an example.Then,a brief introduction to the basic situation and GaoLing branch settled 35KV power transmission project of this project,in-depth analysis of the power supply branch GaoLing settled in the management of 35KV power transmission projects in progress control problems in the process,such as scientific progress of the project planning,project schedule content is not comprehensive,unreasonable project schedule control,project schedule control the relationship between the three elements of that schedule,cost and quality between uncoordinated.Again,to address these issues put forward a new plan to improve the project schedule control,that are taking steps in the project decision-making phase and the implementation phase of the project in order to control the progress of the project.Finally,the implementation of countermeasures to implement a new project schedule control scheme:the existing project organization to adjust,to build institutional system project schedule control,project implementation schedule dynamic loop control and testing to ensure that the project can be completed on time.
Keywords/Search Tags:Power Transmission, Substation Project, Project Management, Schedule Control
PDF Full Text Request
Related items