Font Size: a A A

The Fast Generation And Updating Of The Autonomous Quota Of Water Supply And Drainage Project

Posted on:2019-07-27Degree:MasterType:Thesis
Country:ChinaCandidate:N J LiFull Text:PDF
GTID:2382330548467929Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
In July 2014,the Ministry of housing and urban and Rural Construction issued a number of opinions on promoting the development and reform of the construction industry.The construction of a city [2014] 92 points out: "to establish a unified and open architecture market system,the construction cost system adapted to the market economy and the matching quota management system should be established to meet the whole life cycle valuation of the different design structures,different complexity and different construction technology and various contracting modes." It is more important to see the importance of the quota management system to establish the construction cost system and the building market system.Especially,to match the project cost system,to meet the market changes,to meet the needs of the users,to determine the quota management system at different stages of the project construction in a timely and accurate way,which is the autonomous quota management system is more important,because only establishing the autonomous quota of flexible application,rapid and convenient operation,which the price is formed timely,accurately,and maintained or updated conveniently,can the independent quota really adapt to the development of market economy,and embody the individual competitiveness of users.This paper aim at the deficiency of the existing quota,which the updating and maintenance are inconvenient for the updating price and consumption data of all resources,and the quota lag behind the shortage of new technology,new technology,new material,new equipment and can't reflect the individual competitiveness of the users.It takes the water supply and drainage project as the research object,Microsoft Office Excel(positive Edition)as the platform,and develops the rapid generation and update system of the autonomous quota of water supply and drainage engineering.The main contents of this paper are as follows: first,it analyzes the current situation,existing problems and reasons of the existing quota in the management and application of construction project management,and puts forward the concept,characteristics and function of the autonomous quota on the basis of summarizing the deficiency of the existing quota.Second,the classification of artificial types and related work level identification certificates which are involved in the construction process of water supply and drainage works is classified and analyzed.The determination method of manual,material and mechanical cost univalent has improved the precision of manual and mechanical cost pricing,and established the corresponding manual unit price,material unit price and construction machinery use cost management system.Third,the corresponding artificial consumption,material consumption and construction machinery consumption management system were established according to the quota suborders of the existing quota and drainage projects;Fourth,construction of the construction machinery consumption management system.The relationship between the unit price management system,the consumption management system and the quota management system has been established.Fifth,according to the principle of rapid generation and updating of the autonomous quota,the fast generating and updating procedure of the autonomous quota has been compiled.The user interface is designed and completed,and the operating platform of the rapid generation and updating of the autonomous quota is built..The popularization and application of the paper promote the user's initiative,flexibility and personality,make up the limitations of the existing quota in the market economy,which is advantageous to that the quota management system adapt to the development of the market economy,and the users to quickly and accurately determine the construction cost of the different layers,different water sections and different times of the construction project,and the users to recognize their own soft strength and hard strength,and fully reflects its individual competitiveness,and which is more conducive to the improvement of the overall management level and technology level of China's construction industry.The fast generation and update system of the autonomous quota provides an efficient and dynamic information management platform for users.Users can combine their own management level and the actual situation of construction technology to compile the autonomous quota for the users through the platform,and to update according to the dynamic changes of the market and the user's own factors at any time,so as to maximize their practical value.
Keywords/Search Tags:water supply and drainage engineering, the autonomous quota, the existing quota
PDF Full Text Request
Related items