Font Size: a A A

Shenyang H Five-star Hotel Mechanical And Electrical Engineering Project Construction Management Research

Posted on:2018-10-28Degree:MasterType:Thesis
Country:ChinaCandidate:W Q DuFull Text:PDF
GTID:2382330545955943Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
With China's economic development,tourism has also been rapid development,tourism on the role of stimulating the city's economy,promote social employment and enhance the driving force of culture and the environment more and more obvious.Tourism service infrastructure construction is also accelerating the pace of construction,the hotel industry is rapidly rising,ushered in the rapid development of opportunities.Five star hotel facilities luxurious and perfect,comprehensive service.According to the use of different functions set up banquet restaurants,leisure bars,gym and conference hall,comprehensive service facilities are more complete.Therefore,in order to ensure that the above function area can achieve the expected use function,it determines the hotel project mechanical and electrical system pipeline complex,involving a wide range of characteristics.And a stable,reliable,comfortable,energy-saving mechanical and electrical system is one of the basic conditions for the successful operation of five star hotels.The management of hotel development and construction has realized that the construction management of the hotel project is one of the keys to the success of the later period of the hotel.With the development opportunities China Hotel,to meet the requirements of modern project management,the construction of hotel management to innovation,to participate in hotel construction management,according to the construction requirements and characteristics of the hotel,the dynamic management of project management,to achieve the project objectives.In this paper,from the perspective of Shenyang H hotel project site managers,this paper expounds the main contents of the construction and management of the construction of five star hotel and the main content and control points.Taking the project implementation stage as the research object,the project construction management method is summarized and studied,and the management mode of unified standard procedure is formed to improve the project management level of the project.In addition,this paper is a new attempt to study the project management professional development,I believe that the development of the project of other star hotels will be a good reference template.
Keywords/Search Tags:five-star hotel, Mechanical and electrical engineering management, The project management
PDF Full Text Request
Related items