Font Size: a A A

Study On Cost Management Of Slotting And Filling Of Asphalt Concrete Pavement Of Common Highway

Posted on:2019-12-04Degree:MasterType:Thesis
Country:ChinaCandidate:Z X LuFull Text:PDF
GTID:2382330545474994Subject:Engineering
Abstract/Summary:PDF Full Text Request
In the process of the development of China's highway pavement maintenance,joint as a powerful means of filling cracks,are of great concern for road workers,the cracks were pouring,performance can not only enhance the road,but also can prolong the service life of the roadCost management in construction enterprises is an important means in controlling the cost and reducing the cost in the process of pursuing the maximization of enterprise value and obtaining greater economic benefits.The cost management of highway construction project is an important economic activity of construction enterprise,and is the central task of enterprise daily operation.It is of great significance to do a good job in project cost management of construction enterprises.This paper mainly studies the cost management of highway crack irrigation and seams.This paper first summarizes the theory of construction project cost management,including the concept and content of project management,the general procedure of construction project management,the composition and influencing factors of construction project cost,and the cost management method of construction project.Then aiming at the pavement crack notch pouring situation of construction project cost management are analyzed,summarized the slotting seam filling common problems and causes of construction cost management,on the basis of cost management methods and puts forward some concrete countermeasures for effective control of construction cost.Finally,taking the JK notch pouring construction project cost management case study,and as the starting point,try on the pavement notch pouring construction project cost problems to solve,starting from the people material machine three,the project cost management method,in order to achieve the purpose of the project cost management,reduce construction cost.This paper not only for the construction enterprises to improve the asphalt concrete pavement notch pouring the actual value of the construction cost management level is high,the highway management department in the prophase of curing limited funds under the promotion of slotting irrigation application joint construction technology,so as to keep the technological state of the highway,to enhance and improve the service level of the highway has important social significance benefit the use of maintenance funds.
Keywords/Search Tags:highway, construction project, the cost management, purchasing, mechanical equipment
PDF Full Text Request
Related items