Feasibility Study On Diversion Of Nandonggou In Buzhaoba Open-pit Mine

Posted on:2020-06-03Degree:MasterType:Thesis
Country:ChinaCandidate:C G YuFull Text:PDF
GTID:2381330590452001Subject:Mining engineering
Abstract/Summary:PDF Full Text Request
In view of the influence of Nandonggou on the production of the Buzhaoba open-pit mine,Xiaolongtan mining bureau,this paper studies the necessity,feasibility,line layout and construction organization of the Nandonggou renovation with the methods of field investigation,mathematical statistics and technical economics.The analysis results show that Nandonggou will not only have a significant impact on the recent production capacity,mining and stripping relationship and operational safety of the Buzhaoba open pit mine.It will also affect the five-stage expansion project of Xiaolongtan Mining Bureau and the utilization and sustainable development of mining resources.Based on the comprehensive consideration of the climate,hydrology,geology and topography of the mining area,three schemes for the alteration of nandonggou are put forward.Firstly,a tunnel scheme is arranged in the east-north direction of Buzhaoba Open-pit Mine,which full length 4854 m,tunnel 4664 m.Secondly,the tunnel scheme for crossing the Yunnan-Vietnam metre-gauge Railway,which full length 5637 m,the tunnel 5423 m,and crossing the Yunnan-Vietnam metre-gauge Railway under the open ditch section 50m-60 m after the tunnel exit;Thirdly,the open channel scheme starts at 81.63 m in the southwest of the stope and 81.63 m in the northeast of the tunnel,and its exit is the current Nandonggou at 145 m outside the east side.The total length of the open ditch is 4120 m.This paper designs the starting point and exit position,route direction,system composition,hydraulic gradient and other contents of the 3 schemes,and calculates the construction amount,flood passage capacity and system construction investment of the 3 schemes.Considering the technical difficulty of project construction,system construction investment,and operational reliability,the three Nandonggou Diversion plans were comprehensively compared.It is recommended to adopt Scheme 1,namely the North East Tunnel Project.According to the recommended Nandonggou Diversion plan,the geological feasibility of Nandonggou,the interaction with ground facilities,construction organization and environmental protection were analyzed.The research results of the project are of great significance for the safe and sustainable development of the Buzhaoba open-pit mine,and also have important reference significance for similar open-pit mines in China.
Keywords/Search Tags:Open pit mine, river diversion, tunnel, open channel
PDF Full Text Request
Related items