Font Size: a A A

Every Cloud Has A Silver Lining:Road To The Transformation Of Financing Way Of X Sewage Treatment Enterprise

Posted on:2017-03-29Degree:MasterType:Thesis
Country:ChinaCandidate:L M JinFull Text:PDF
GTID:2381330572464709Subject:Business Administration
Abstract/Summary:PDF Full Text Request
This paper mainly through the X sewage treatment enterprise business development process,the original BOT financing model,H project of the new challenges and response measures of the four aspects of the X sewage treatment enterprise financing mode transformation background,why transformation,Transformation Opportunity and how to transform,from the real reduction of X sewage treatment enterprises from BOT to PPP financing model transformation of the way.This paper first introduces the basic concepts of BOT and PPP,not only BOT and PPP financing mode is clearly defined,but also the BOT and PPP financing model is compared and analyzed,and the possibility of X sewage treatment enterprise financing mode transformation of the way to do a theoretical basis.The main difference between BOT and PPP financing model is whether the project will have the participation of the government and the public sector,and whether the actual controller of the item company has the government shares.BOT financing mode is from the end of the project has been to the project after the transfer,only the enterprise to bear all the cost of cooperation,the main financing is still the main business.PPP financing mode is from the project to the project to the transfer of the entire process of both government and enterprises to participate,the main financing for the item company,and the actual control of the item company for the enterprise and government.X sewage treatment enterprises are the top five of the industry's family business,which was started by selling sewage treatment equipment,experienced by the pure equipment sales to increase infrastructure projects,and then to the responsible equipment sales,installation,infrastructure projects and the operation of the latter part of the business development stage.Due to the cooperation with the government of large-scale water treatment projects more and more,reimbursement slower and financing methods obsolete,so that the original BOT mode of X sewage treatment enterprises brings obstacles to the development of enterprises.Many of the challenges brought by the X sewage treatment enterprises in the face of H municipal government Dallas project,H reached an agreement with the municipal government,the Dallas project financing mode transition to PPP mode.The successful transformation of Dallas project financing mode breaks through the bottleneck of processing enterprise financing pattern of X sewage,take the PPP item company as the main financing in the first round of financing brought 2 billion yuan of project funds for the enterprise,also attracted the attention of many strategic investors.X sewage treatment enterprise financing model transformation is a very typical real case,the case in-depth analysis of the sewage treatment industry is not conducive to the future of the financing mode of exploration and development,and infrastructure financing mode from BOT to PPP transformation provides a reference basis.
Keywords/Search Tags:Sewage treatment, Financing way, PPP, BOT
PDF Full Text Request
Related items