Font Size: a A A

Study On Material Purchasing Management Of A Resettlement Housing Project Based On Construction Supply Chain

Posted on:2017-10-12Degree:MasterType:Thesis
Country:ChinaCandidate:J B JinFull Text:PDF
GTID:2359330566956630Subject:Project management
Abstract/Summary:PDF Full Text Request
Project Procurement Management is an important part of the project management of the engineering system,and construction projects closely linked to the whole process related to the project’s ability to achieve the expected investment returns.Today’s more competitive,more and more attention to detail management,saving material and reducing waste has become essential to win the competition in the market an important part,and building supply chain management is able to adapt to changing patterns of modern project management,better able to achieve cooperation participants and reduce costs.In this paper,a move back to resettlement housing project to study the examples,first,analyzes the background and significance of the paper;then,supply chain and projects for construction materials procurement and management of basic theoretical research,including building supply chain and project management of both material procurement respect;On this basis,we analyze the ideological project of traditional materials procurement management mode,characteristics and problems,this leads to the characteristics of the supply chain of substances based on purchasing patterns,strengths and building process;then from the Project Overview,project organization structure introduced the basic situation of a move back to resettlement housing projects,analyzing the move back to resettlement housing project is currently in the procurement of material problems include: classification of materials procurement unreasonable,procurement strategy and vendor unclear procurement management is imperfect,then proposed Based on the corresponding building material procurement supply chain management strategy,eventually proposed the implementation of safeguards in a move back to resettlement housing project material procurement management,which includes: the establishment of centralized procurement network trading platform,strengthen project material management inspections and examinations,developing materials requirements planning and implementation Turnover materials management system..
Keywords/Search Tags:Construction Supply Chain, Project, Material Purchasing Management
PDF Full Text Request
Related items