Font Size: a A A

Production Process Reengineering Of Wind Cabinet In Guo Dian Company

Posted on:2017-07-18Degree:MasterType:Thesis
Country:ChinaCandidate:Y LuFull Text:PDF
GTID:2359330566956589Subject:Project management
Abstract/Summary:PDF Full Text Request
Currently,China wind power manufacturing enterprises have to face strategic challeng es such as fierce competition and potential developing opportunity in the global environme nt.However,the China Wind Power Generation manufacturing enterprises compare with th e world first-class countries still have significant disparity due to the production process are relatively fall behind in the manufacturing management and efficiency factors.Nevertheless,process optimization is an important mark in the history of management s cience,it is also a advancing management theory.Therefore,this article mainly described the specialty Wind Power basic information.In the paper,the article emphasized the current situation in fan control cabinet and production pro cess of Chinese wind power manufacturing enterprises,and then develop an optimal project on the issue such as the long-term production cycle,lack of quality control and the unreaso nable personnel allocation.The paper described from the theoretical analysis to practical problems.put forward some countermeasure and suggestion,combined with planning and practical application of the new process,reflects some views of the process optimization to the company`s production.This paper mainly based on the theory of lean management and material handling,combined with foreign successful experience and the actual situation of the company,designed in accordance with the company`s production process optimization scheme.Through the optimization,design a new production process for the company,and it has been proved by preliminary implementation of use value.Hope this research can offer some feasible implementing scheme to the enterprise production process optimization.Through this research,not only solve the problem of the company in the production,eliminated the waste in the production process,distributed the workshop,improved the efficiency,reduced the production costs,but also found the bottleneck process and the problems need attention on production,provide a direction of the continuous improvement for the company.
Keywords/Search Tags:BPR, wind power, environment
PDF Full Text Request
Related items