Evaluation Study On The Economic Benefit Of The Project Of Fire Guolong PV Power Station

Posted on:2018-03-24Degree:MasterType:Thesis
Country:ChinaCandidate:P C YangFull Text:PDF
GTID:2359330542978107Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the change of energy industry in the world,our country pay much attention to the development of electricity green energy.The investment enthusiasm of photovoltaic power stations is increasing year by year,that is why evaluate the project is so important.The post-project evaluation is a part of the project evaluation,which can totally restore the difference between the fact and the design.This paper focuses on the post-evaluation evaluation of economic benefit.By analyzing the key factors affecting the project economic data,find out the changes in the project and when it is designed.On one hand,we can discover problems promptly,learn from mistakes of the past,find out how to settle the problem of the later stage.On the other hand,it can make experience from new project and enhance the ability of feasibility study.This paper is a post-project evaluation research which is based on the analysis of the key factors in the economic data of Huo Gulong pv power station.Research on economic data of the project,find out the important points which can affect it,and find out the reason.First of all,through the elaboration of project evaluation theory development process and its significance in risk management,clear the direction of the post evaluation of construction project as the research,and determine the project after the evaluation after the project economic evaluation as the focus of the analysis.Secondly,based on the comparative study,the Huo Gulong photovoltaic power station project construction period in the last two years since the grid-connected power generation investment and economic data after power generation,in-depth excavation of the difference between data and reasons,find differences of data and larger effects on the economic indicators of the key factors.Thirdly,The reasons for the difference between the factors of serious quantitative analysis and the key factors that directly influence the project indicators are found,from the Angle of quantitative and qualitative analysis of key factors caused the main reason for the differences.To guide the project investment,guide the economic evaluation of the project,and reduce the risk of investment.Based on the analysis of the factors and economic data in the evaluation system of the economic benefit of the Huo GuLong project,the accuracy of the feasibility study report is been evaluated.It is found out that land price,update of equipment technology,outsourcing in feasibility study stage and the running stage,led to a big difference on the economic data.All of these points need to be considered very seriously on new large photovoltaic projects' investment in the furture.So that we can reduce the risk and increase the ability on business investment.
Keywords/Search Tags:Key Factor, Post-Project Evaluation, Economic Evaluation, Investment Ability
PDF Full Text Request
Related items